Laserfiche WebLink
The 12 inch sub-trunk has design capacity to serve the area <br />north of Industry Avenue within Sewer Distict i of the <br />Comprehensive Plan. <br /> <br />Public Water Facilities <br /> <br />As previously mentioned, the City of Ramsey has a municipal <br />water system located in the southeast area of the City. This <br />system is a hydropneumatic system which consists of one 500 <br />gallons per minute well and a pressure tank. The City recently <br />awarded a contract to install a second 500 GPM well south of the <br />existing pumphouse to provide additional capacity to the system. <br /> <br />It is proposed to connect the Industrial Area to the existing <br />water system and therefore, delay the construction of source and <br />storage. This would require the extension of a twelve (12) inch <br />trunk watermain from Dysprosium Street and Industry Avenue to <br />the intersection of Sunfish Lake Boulevard and Industry Avenue. <br />The location of the proposed watermain is shown on Exhibit C. <br /> <br />When current studies on the groundwater surrounding the Anoka <br />Landfill have been completed, the placement of wells and storage <br />facilities in the Industrial Area can be better determined. <br /> <br />6 <br /> <br /> <br />