My WebLink
|
Help
|
About
|
Sign Out
Home
11/05/86
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1986
>
11/05/86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 4:16:08 PM
Creation date
7/21/2004 10:08:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
11/05/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Storage <br /> <br />As stated in the City's Comprehensive Water Plan, the ultimate <br />projected water storage requirement is six million gallons. The <br />proposed facilities include three (3) one-million gallon ele- <br />vated reservoirs and one (1) three-million gallon ground <br />reservoir. <br /> <br />To minimize the financial impact on the City during the first <br />few years of the water system operation, it was proposed to use <br />a hydropneumatic system. This system does not meet fire flow <br />demands, nor does it supply water through an extended power <br />outage or equipment breakdown. However, it does provide basic <br />water service at a relatively constant pressure. <br /> <br />The City is currently considering the use of tax increment <br />financing to finance the construction of a water tower. It has <br />been determined, due to the location of the airport, that the <br />first water tower would be located on the east side of the City. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.