My WebLink
|
Help
|
About
|
Sign Out
Home
11/05/86
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1986
>
11/05/86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 4:16:08 PM
Creation date
7/21/2004 10:08:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
11/05/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the con- <br />struction, interest during construction and overhead costs. <br />Construction costs are estimated contract amounts for the actual <br />construction. Right-of-way costs are included for those right- <br />of-ways required to construct the project. Overhead costs <br />include, but are not limited to, engineering, construction <br />staking and inspection, administrative service, legal, bonding, <br />fiscal and contingency. Overhead costs for the project shown at <br />the conclusion of each schedule summary are estimated based on <br /> <br />percentages of construction cost. Those percentages are <br /> <br />estimated to be as follows: <br /> - Engineering 8% <br /> - Staking & Inspection 7% <br /> - Bonding, Fiscal & Legal 2% <br /> - City Staff Administration 5% <br /> - Contingencies 6% <br /> <br /> - Interest during Construction 4% <br /> <br />Interest during construction or capitalized interest was based <br />on a construction period of six months and an annual interest <br />rate of eight percent (8%). If construction periods are <br />extended, these costs could be larger. <br /> <br />The estimated cost of construction plus overhead are shown as <br />the estimated project cost on the following tables: <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.