Laserfiche WebLink
TABLE I <br /> <br />TRUNK & SUBTRUNK SANITARY SEWER <br /> FOR <br /> THE INDUSTRIAL AREA <br /> <br />ESTIMATED COSTS <br /> <br /> Item <br /> <br />30" Reinforced Concrete Pipe (RCP) <br /> <br />Jack 30" RCP Under Sunfish Lake Blvd. <br /> <br />12" Subtrunk Sewer, 8" Lateral & Service Connections <br /> <br /> Total Estimated construction Cost <br /> <br /> Engineering, Administration & <br /> Contingencies (32%) <br /> <br /> Right of Way Costs <br /> <br /> TOTAL ESTIMATED PROJECT COST <br /> Estimated Lateral Benefit (Subtrunk) <br /> <br /> NET TRUNK COST <br /> <br />Estimated Cost <br /> <br /> $743,600.00 <br /> <br /> 39,000.00 <br /> 127f400.00 <br /> <br />$910,000.00 <br /> <br />291,200.00 <br />391800.00 <br />$1,241,000.00 <br />1001464.30 <br />$1,140,535.70 <br /> <br /> TABLE II <br />TRUNK WATERMAIN <br />ESTIMATED COSTS <br /> <br /> Item <br />Watermain <br /> <br />Jack 12" Watermain under Sunfish Lake Blvd. <br /> and Industry Avenue <br /> <br />Hydrants <br /> <br />Valves, Fittings & Restoration <br /> <br /> Total Estimated Construction Cost <br /> <br /> Engineering, Administration & <br /> Contingencies (32%) <br /> <br /> TOTAL ESTIMATED PROJECT COST <br /> 9 <br /> <br />Estimated Costs <br /> <br /> $230,300 <br /> <br /> 22,500 <br /> <br /> 8,000 <br /> <br /> 89f200 <br />$350,000 <br /> <br /> 112~000 <br />$462,000 <br /> <br /> <br />