My WebLink
|
Help
|
About
|
Sign Out
Home
11/20/86 Jt CC P&Z and EDC
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1986
>
11/20/86 Jt CC P&Z and EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 4:16:54 PM
Creation date
7/21/2004 10:27:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Jt Special CC Planning and Zoning & EDC
Document Date
11/20/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
joining property is zoned business or industrial. <br />Parking areas adjoining other districts shsl! he <br />located closer than 25 feet to the side or ,ear <br />property line, Truck traffic shall be routed around <br />and not through the automobile parking areas. <br />Loading: <br />An off-street loading facility shall be provided with <br />an area of not less than twelve feet in width and sixty- <br />feet on length, exclusive of aisles and maneuvering space. <br />Such facility shall be at the rear of the principal struc- <br />ture and shall be used exclusively for the lo&ding and <br />loading of ~erchandise. All such facilitles, alsles and <br />maneuvering space shall be sur£aced in the same manner as <br />that prescribed for parking areas. <br />Compliance: In order to assure compliance with the <br />performance standards set forth above, the City <br />Council may require the owner or operator of any <br />permitted use to make such investigations and tests <br />as may be required to show adherence to above per- <br />£ormance standards. Such investigation and tests as <br />are required to be sade shall be carried out by an <br />independent test/nE organization as may be agreed upon <br />by the City and the owner or operator, or if there is <br />failure to agree within ten days after written notice <br />by the City to the owner or operator to make such invest/- <br />gation and tests, by such independent testing organiza- <br />tion as may be selected by the Council. Yhe Costs in- <br />curred in having such investigations or tests conducted <br />shall be borne entirely by the owner or operator. The <br />procedure stated above shall not preclude the City from <br />taking any such other tests and investigations it <br />finds appropriate to determine compliance with these <br />performance standards. <br /> <br />All costs incurred by the City in processing an application for a <br />site plan review shall be paid by the applicant. Said costs <br />shall include but not be limited to: professional consulting <br />services as directed by the Planning Commission and/or City <br />Council, copying charges, extraordinary City staff involvement, <br />public hearing publications, and written notice to adjacent <br />property owners. A set fee established from time to time by the <br />City Council shall be deposited with the City at the time the <br />application is made. At the time the application is made, if the <br />Zoning Officer determines that costs in addition to the set fee <br />will likely be incurred by the City, then an additional sum as <br />determined by the Zoning Officer shall be deposited with the <br />City. Any portion of those funds deposited but not expended <br />shall be returned to the applicant after final action on the <br />application. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.