Laserfiche WebLink
5- indicates that the criterion is of exceptional <br /> importance. <br />4- indicates that the criterion is very important. <br />3 - indicates that the criterion is important. <br />2 - indicates a criterion of normal importance. <br />1 - indicates a minor criterion. <br /> <br />The POINTS EARNED for each criterion are the product of <br />.multiplyin~i the SCORE times the MULTIPLIER, The MAXIMUM <br />APPLICABLE1POINTS in each chart are added together and <br />the POINTSiEARNED are added together tO get TOTALS. By <br />dividing the TOTALS-POINTS EARNED by the TOTALS-MAXIMUM <br />APPLICABLE~POINTS, the PERCENTAGE EARNEQ is determined. <br />The PERCENTAGE EARNED must be at least the minimum <br />percentage specified for that ACTIVITY category. <br /> <br /> (c) Residential Density. The residential density of a <br /> project is dependant upon its locational attributes as <br /> indicated on the DENSITY CHART. Each residential <br /> development proposal must achieve a TOTALS-EARNED CREDIT <br /> of 100 percentage points ~)r more of th~ locational <br /> attribul,!es, The perc,~ntages listed fo'l- each cri- <br /> terion ~s the MAXIMUM [REDIF a development~ can achieve <br /> for a I~articular loca'~.ion~l attribute. If only a <br /> portion~ of the proposed dwelling units are within <br /> the ma~Imum distance staled, the EARNED CREDIT would be <br /> IH / ' <br /> reducei~i proportionately. For those projects whose <br /> locaticifial attributes do not achieve the minimum score <br /> the DEi~iSITY CHART allows for optional EARNED CREDI~ <br /> dens i t~ i bonu ses. <br />l]esign Standards !~nd Criteria <br /> <br />I <br />I <br />! <br />I <br /> <br />! <br />i <br />! <br />I <br />I <br />I <br /> i <br /> I <br /> I <br /> <br /> <br />