Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> An <br /> <br />requirements. <br />this program. <br /> <br />alternate seed mixture may be used based on seasonal <br /> The Department will be advised prior to any changes in <br /> The turf cover will be inspected by the Department one <br /> <br />year after the above seeding, mulching and/or fertilizing for adequacy. <br /> 6. Certification <br /> <br /> Upon completion of the activities listed in items 1 through 5 <br />above, the Department will be provided with a certification by a <br />qualified registered professional engineer that the landfill has been <br />closed in accordance with the approved plans, ordinances, and license <br />conditions. The certification shall be submitted no later than sixty <br />(60) days following completion of said landfill closure activities. <br /> <br /> lhe landfill owner and operator will submit a detailed description <br /> of the landfill site to the Department for approval. After approval it <br /> will be submitted to the County registrar of deeds for recording, lhis <br /> description shall include the general type, quantity and locations of <br /> deposited solid waste, the estimated depth of waste fill and final <br /> terrain descriptions, and otheK pert'inent characteristics of the <br /> completed sanitary landfill site. <br /> <br /> Approval of the landfill closure by the County shall be based upon <br /> a professional engineer's certification and inspection of the site by <br /> the County. <br /> <br /> 7. Inspection, Maintenance and Monitorin9 <br /> <br /> Ouring the closure period, all of the inspection, maintenance and <br /> monitoring provisions set forth in the post-closure section (V, <br /> subsection 6) of the Anoka County Solid Waste Ordinance (Ordinances <br /> 73-1, 82-1, 83-2 and 83-3) shall also apply. <br /> <br />6 <br /> <br /> <br />