My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 02/26/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:07:21 AM
Creation date
8/3/2004 11:00:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />i <br />I <br /> <br />II. <br /> <br />III. <br /> <br />PROJECT HISTORY <br /> <br />This ~eport was prepared at the request of the Ramsey City <br />Council at their December 11, 1984 council meeting following <br />receipt of a petition to consider these improvements by the <br />benefited property owner. The petitioner represents one hundred <br />percent (100%) of the proposed area of benefit as shown on <br />Exhibit A. <br /> <br />PROPOSED FACILITIES <br /> <br />Attached to this report are Exhibits A and B showing the pro- <br />posed improvements. These improvements will provide streets and <br />drainage to the proposed Rum River Hills PUD. <br /> <br />Drainage <br /> <br />As part of this project, it will be necessary to construct <br />drainage improvements as shown on Exhibit A. <br /> <br />The proposed drainage improvements consist of detention pond <br />located north of 169th Avenue N.W. on Outlot B. It is also <br />proposed to construct a storm sewer from the detention pond <br />to Outlot E. The storm sewer would provide an overflow from <br />the detention pond and allow for the runoff to flow overland <br />across Outlot E into the Rum River. <br /> <br />To accommodate drainage from Iodine Street, it is proposed <br />to construct a drainage swale between Lots 8 and 9, Block 5. <br />This swale would outlet on Outlot D and drainage would flow <br />overland across Outlots D & E to the Rum River. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.