My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/22/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 10/22/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:43:15 AM
Creation date
8/4/2004 10:22:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/22/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Daniel A. Come~u <br />September ?5, ]g~i!, <br />Pag(' IEight <br /> <br />A report entitled, "A Feasibility Study of Recovery of Methane from the <br />Anoka Municipal Landfill," dated January ]982 by Emson Associates, <br />(enclosed), provides limited analytical test results of landfill gas. The <br />report describes percentage of methane, carbon dioxide, and oxygen in the <br />landfill gas. The existence of additional air quality and/or landfill gas <br />information is not known to be available. <br /> <br />Time Sequence Aerial Photographs <br /> <br />23. <br /> <br />pages 32-35. The personal recollection of the Site Manager during 1971 <br />and i972, Don Otter, is that the holding basins shown on Figures 32, 33, <br />and 34 of the Evaluation Report were used for containing sewage sludge. <br />A recent telephone conversation with Bob Hutchison of Anoka County <br />supports this information. The holding basins were reportedly constructed <br />over solid waste, not on the bare base grade native soils. WMMI is not <br />knowledgeable about activities at the landfill prior to 1971. <br /> <br />IDENTIFICATION OF POSSIBLE ALTERNATIVE RESPONSE ACTIONS <br /> <br />Introduction <br /> <br />24. Con~ent noted. <br /> <br />Treatment at Off-Site Point of ImpQct <br /> <br />25. Comment noted. <br /> <br />Final Grade Adjustment and Approved Cap.Design <br /> <br />26. Comment noted. <br /> <br />PROPOSED REMEDIAL INVESTIGATION WORK PLAN ADDENDUM <br /> <br />Introduction <br /> <br />27. <br /> <br />A proposal for additional monitoring activities has been submitted to, <br />and approved by, MPCA. A discussion of other field activities and <br />analysis of the collected data is provided in the responses below. Future <br />proposals for supplemental monitoring activities will be submitted to the <br />MPCA as the need arises during the on-going WIqMI evaluation of data in <br />accordance with the phased approach described in Exhibit A to the <br />Consent Order. <br /> <br />Data Management <br /> <br />Page 12. Data compilation and evaluation is an on-going internal <br />procedure. Typical products of the compilation and evaluation which will <br />be submitted in the Final Report are listed below. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.