Laserfiche WebLink
Table 4:Benefit-Cost Analysis Results(3 Percent Discount Rate) <br /> Present Worth(3 percent discount rate) <br /> Cost Benefit B/C Ratio <br /> Construction/Right-of-way $ 21,259,223 <br /> Salvage Value of Construction $ (1,485,000) <br /> Accident Reduction Savings $ 815,000 <br /> Annual Vehicle Operating Cost Savings $ 1,930,000 <br /> Annual Travel Time Cost Savings $ 21,175,000 <br /> Total $ 19,774,223 $23,920,000 <br /> US 10/CSAH 56 FASILANE Application 24 City of Ramsey <br />