Laserfiche WebLink
The final product for this task will be a plan set approved and signed by MnDOT. <br /> Task 3: Preliminary Bridge Design and Plan Preparation <br /> Bolton&Menk will complete the preliminary design of the structural components of the project to allow for MnDOT <br /> review and approval of a Preliminary Bridge Plan. Components of this task include: <br /> • Obtaining and reviewing existing data, <br /> • Preparing connection details for the new structure to the Transit Station, <br /> • Preparing a preliminary design of the structure and helix ramp, <br /> • Preparing preliminary quantity estimates and cost estimates, <br /> • Submittal of the preliminary design to MnDOT Bridge Office for review, and <br /> • Performing QA/QC throughout the preliminary design process. <br /> The final product for this task will be a Preliminary Bridge Plan approved and signed by MnDOT. <br /> Task 4: Final Bridge Design and Plan Preparation <br /> After completion of Task 3, Bolton&Menk will begin the final design of the structural components of the project. <br /> Components of this task include: <br /> • Prepare 60%plans,including estimated quantities and costs, <br /> • Submit 60%plans to City and MnDOT Bridge Office for review and comment, <br /> • Prepare a comment resolution log prior to proceeding further with the design, <br /> • Prepare 90%plans,including estimated quantities and costs, <br /> • Submit 90%plans to City and MnDOT Bridge Office for review and comment, <br /> • Prepare final quantities and final cost estimate, <br /> • Submit Final Plans to MnDOT Bridge Office for signatures, <br /> • Update the Comment Resolution logs and Plan Review Checklist, and <br /> • Performing QA/QC throughout the design process. <br /> The product for this task will be an approved Final Bridge Plan signed by MnDOT. <br /> Task 5: Specifications, Cost Estimating and Load Rating <br /> Bolton &Menk will prepare specifications in accordance with MnDOT requirements for Federal Aid projects. <br /> We will also prepare a Load Rating for the bridge for approval by MnDOT. <br /> Submitted by Bolton&Menk,Inc. Mississippi Skyway I City of Ramsey,MN 3 <br />