My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/1979
Ramsey
>
Public
>
Agendas
>
Council
>
1979
>
Agenda - Council - 02/12/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:35:53 PM
Creation date
8/10/2004 1:43:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> <br />The Hydraulic system shall include .all interconnecting <br />piping, provided with quick disconnects for the one-way <br />plow and the sander, and shall include an 18 gal. reservoir, <br />a filter with 33 micron element, gauge and return line. <br /> <br />The pump and controls shall be of adequate capacity to <br />operate the equipment noted above. The valve bank shall <br />be mounted outside the cab and shall be operated by rods <br />to levers located inside the cab between seats. <br /> <br /> The sander controls also shall be located inside the cab <br /> between the seats. <br /> 6. Trailer Hitch: Shall be fitted with a holland t-lO0 pintle hook with <br /> reinforcing "A" frame. <br /> 7. Auxiliary lights: Provide high mounted sealed beam headlights, (mounted <br /> on plow frame bracket), wing light and sander light. Mount <br /> rear turn signals and tail lights on rear of dump box in pro- <br /> tected location. Install revolving light with leveling bracket <br /> with counter balance, mounted on the cab shield with dash <br /> mounted switch. <br /> 8. Paint: All equipment and connections or brackets shall be given one <br /> coat of primer and one coat of Highway Orange (93-55546H) <br /> to match the cab. <br /> 9. Warantee' Each bidder shall furnish a signed warantee of the equipment <br /> <br /> included in this package. The warantee period shall be for <br /> a period of at least one year, and cover all parts and labor <br /> from defects in material and workmanship. <br /> <br />· 10. Manuals: The successful bidder shall furnish operator's manuals, shop <br /> manuals, lubrication charts and parts books for the various <br /> items of equipment being furnished. <br /> 11. All noted equipment shall be installed <br /> 12. The bidder shall state in his proposal a complei~e description of each <br /> item of equipment being furnished. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.