Laserfiche WebLink
09/22/16 REVISOR CKM/IL AR4240 <br />42.1 (3) identification of techniques for preservation of those view corridors <br />42.2 identified in the local government's plan; and <br />42.3 (4) opportunities for creation or enhancement of public river corridor views. <br />42.4 Subp. 3. Location of structures. <br />42.5 A. Structures and impervious surfaces must not be located in the shore impact <br />42.6 zone and must meet the following setback requirement from the ordinary high water level <br />42.7 of the Mississippi River and other waters within the Mississippi River Corridor Critical <br />42.8 Area, as specified for each district: <br />42.9 (1) CA-ROS: 200 feet from the Mississippi River and 150 feet from the <br />42.10 Minnesota River and Vermillion River; <br />42.11 (2) CA -RN: 100 feet from the Mississippi River and 75 feet from the <br />42.12 Rum River and Vermillion River; <br />42.13 (3) CA -RTC: 75 feet from the Mississippi River, Crow River, and Rum <br />42.14 River; <br />42.15 (4) CA -SR: 75 feet from the Vermillion River; <br />42.16 (5) CA -UM: 50 feet from the Mississippi River; <br />42.17 (6) CA-UC: as specified in underlying zoning; and <br />42.18 (7) for all other public waters within the Mississippi River Corridor Critical <br />42.19 Area, as specified in underlying zoning. <br />42.20 B. Structures and impervious surfaces must not be located in the bluff impact <br />42.21 zone and must meet the following setback requirements from the bluffline as specified <br />42.22 for each district: <br />42.23 (1) CA-ROS: 100 feet; <br />42.24 (2) CA -RN: 40 feet; <br />6106.0120 42 <br />