My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 10/14/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:06:42 PM
Creation date
9/10/2004 12:42:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the cost of completing all landscaping improvements to include land- <br />scaping as shown on the approved site plan~ final site grading, lighting, <br />driveways or parking areas, curbing and approved fire lane. Construction <br />of the building shall be as shown on the building design plan, drawing num- <br />ber 1637 dated August 15, 1980, and as approved by the City's Building <br />Official. Applicant shall substantiate his costs for all landscaping im- <br />provements to the City Administrator or his representative. Applicant <br />acknowledges that failure to complete the landcaping improvements defined <br />above by August 1, 1981, shall result in forfeiture of the financial <br />guarantees provided to the City of Ramsey. Parking area shall be con- <br />structed of four (4) inches of Class V base material and two (2) inches <br />of b~tuminous mat surfacing. F. scrow amount is <br /> <br /> 4) As applicant complies by completing the site conditions <br />defined under Item 3, the City of Ramsey may release all, or any portion <br />of, the financial guarantee upon written request to the City of Ramsey, <br />however, in no event shall the ~ity of Ramsey release any amount which <br />would reduce the remaining guarantee below 150% of the cost to complete <br />all remaining site conditions. <br /> <br /> 5) In addition to the site plan improvements, dimensions, <br />etc. as shown on the August 15, 1980 site plan the following conditions <br />shall be met: <br /> <br />a) A 15' wide drainage and utility easement running <br />to Anoka County shall be conveyed to the County, said <br />easement shall be west of Armstrong Blvd. parallel <br />with and adjacent to the 60' to center line road ease- <br />ment as shown on the August 15, 1980 site plan. <br /> <br />b) The State Fire Marshal's approval of the gasoline <br />pump location shall be required before the pump's <br />installation. <br /> <br />c) Soils and p'erk tests indicating th'e feasibility of <br />the development of the site shall be submitted to the <br />City. <br /> <br />d) A grading plan and a site drainage plan indicating <br />the site's drainage provisions shall be provided to the <br />City. <br /> <br />e) A 20' wide fire lane shall be provided adjacent to <br />the front or street side of the building. <br /> <br />f) A landscape design plan shall be provided to the <br />City. <br /> <br /> 6) The Southerly access into the site from Armstrong Blvd., <br />as shown on the August 15, 1980, site plan shall be a permanent access. <br />The Northerly access shown on the August 15, 1980 plans shall be temporary. <br />and will be removed when the property to the North of the site is developed <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.