My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 10/14/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:06:42 PM
Creation date
9/10/2004 12:42:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and a frontage road constructed. At such development time, the Southerly <br />access above described shall be designated for ingress oniy. The purpose <br />of this restriction is to eliminate to the extent possible stacking in <br />the south bo~und lane of Armstrong Blvd. <br /> <br /> 7) Application to the City's Board of Adjustment for approval <br />of (l) the two accesses onto Armstrong Blvd., a thoroughfare street, and <br />(2) the gas pump location (closer than 50 feet to the right-of-way) shall <br />be required. Failure to obtain said variances shall require City approval <br />of a revised site plan reflecting the Board of Adjustment's'action. <br /> <br /> 8) The required building permit shall be issued for the en- <br />tire tract as described in LEGAL DESCRIPTION OF PROPERTY herein. It is <br />agreed by the Applicant that he will assist and cooperate in all respects <br />in assuring that the entire parcel described herein is platted, with his <br />specific parcel, as shown on the August 15, 1980, site plan then being one <br />of the lots of the plat. This agreement shall be null and void and no <br />building permit will be issued unless and until the fee owner reaches an <br />agreement with the City as to the platting of the entire parcel. <br /> <br /> 9) A building permit for the project will not be issued ~ntil <br />all of the above requirements have been fully complied with. <br /> <br /> 10) If the Applicant does not commence construction of his <br />project, including physical facilities, within six (6) months following <br />approval of this agreement, the City Council approval shall be considered <br />null arid void for the entire project, unless an extension is granted by <br />the City Co~uncil. <br /> <br />APPLICANT: <br /> <br />BY <br /> <br />Date Signed: Title: <br /> <br />CITY OF RAMSEY: <br /> <br />Date Signed: <br /> <br />BY <br /> <br />BY <br /> <br />Mayor <br /> <br />City Administrator/Clerk <br /> <br />WITNESS'ES <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.