|
Exhibit
<br />
<br />RAMSAY TOV'/N C,--~TER: ~,ou~h Park
<br />
<br />orelimJnsry cost estimate revised 7/28104.
<br />
<br />.~ITEW©RK.
<br />
<br />Erosion '~' '
<br /> ,..oaf roi
<br />
<br />Qtv~ Uni~
<br />
<br />Total: $ 6,500.00
<br />
<br />Site Utilities Total: $ 54,100.00
<br />
<br />Earthwork Total: $ 41 5,280.00
<br /> ma~.~ grading, fim.sh grading, nellon so4~, lop.~od, e~c. 4~5.280.00
<br />
<br />Pqtuminous Total: $ 20,000.00
<br /> parking io! drive a~sie 20,000,00
<br />
<br />Concrete Total: $ 202,800.00
<br />
<br />porou[ pavement ~ 20,000.00
<br />concrete apron[ 20,000.00
<br />s~rJewalk: 3£,000.00
<br />cur~ and gutter 2 i ,000.00
<br />cencreie pad.s (3'x7) - bench 2,000.00
<br />concreie pod~ (7'x9) . p~cnic ia~le 4,800.00
<br />
<br />Architecture and Amenities
<br />
<br />Total: $ 325,000.00
<br />
<br />park povdion I EA 200,000.00 200,000.00
<br />bo~ebqJl ;nfieid, dugout[, bock[lop, sops, er goo/s 45,000.00
<br />ia/lot /pioy area 60,000.00
<br />,'re.sc slgnrjge 10,O00.O0
<br />entry monument~ 2. EA 5,000.00 10,000.00
<br />
<br />Lighting and Site Elec:irJcal
<br />
<br />Total: $ 42,000.00
<br />
<br /> eiec~r~cal ~eryice, convemence alee. I0,000.00
<br /> park ng lot fighhng °u ~A 4,000.00 32,000.00
<br />
<br />Site furnishings Total: $ 27,800.00
<br />
<br />benche~: park: Arcaio- poiy die, backed ~ arms 4 ~A 2,000.00 8,000.00
<br />ira,~h recepiacle,~ - to match ~encaes 3 ~A ],000,00 3,000.00
<br />p~cmc iat~ie~. ] 2 EA 950.00 / 0,000,00
<br />~drm~ing .;ounto~n ~ a.~socla~ed piumbmg ] EA 5,000.00 5,000.00
<br />grillez 4 ~A 300,00 I ~200.00
<br />
<br /> e~ke parking ioop.~ 6 EA 100.00 600.00
<br />
<br />Irrigation Total: $ 60,000.00
<br />
<br />LandscaPe Improvements Totoh $ 98,000,00
<br />~urt' :eeding 3.30 AC 4,350.00 20,000.00
<br />~.reez, si~ru~s, flowers and o/her planting~ 150 EA 400.00 78,000.00
<br />
<br />TOTAL $ 1,251,480.00
<br />
<br />-348-
<br />
<br />
<br />
|