Laserfiche WebLink
Exhibit 8 <br /> <br />RAMo~Y TOVVN E~NTER: South Park <br /> <br />preliminary cost esdmate revised 7/28/04 <br /> <br />.SITEWORK: <br /> <br />Erosion Control <br /> <br />Qty. Unit <br /> <br /> ?~ice Estimate <br /> <br />Total: $ 6,500.00 <br /> <br />Site Utilities Total: $ 54,100.00 <br /> <br />Earthwork Total: $ 415,280,00 <br /> mass grading, ilmsb ,jrorJing, notion ~adx, tapsad, cir. 4 ] 5,280.00 <br /> <br />Bituminous Total: $ 20,000,00 <br /> parking ia/ dr~ve rJ,ste 20,000.00 <br /> <br />Concrete Total: $ 202,800.00 <br /> <br />s~a'ew,flk ~ <br /> <br />,:oncrele pod~' (3'x7) · bench <br />concrete pads [7'x9'] - p~cn~c fable <br /> <br />Architecture and Amenities <br /> <br />20,000.00 <br />20,000.00 <br />35,000.00 <br />21,O00.00 <br />2,000.00 <br />'4,800.00 <br /> <br />Total: $ 325,000.00 <br /> <br /> pork pavilion 1 EA 200,000.00 200,000.00 <br /> basebcdl mlletd, dugoulL br~ck;lep, ~accer goals 45,000.00 <br /> Iotlot / play area 60,000.00 <br /> rni~c s~gnage 10,000.00 <br /> enlry re~oelu~ner~l~ 2 E,4 5,000,00 10,000.00 <br /> <br />Lighting and Site Electrical Total: $ 42,000.00 <br /> <br />parking lot li~hnng <br /> <br />10,000.00 <br />32,000.00 <br /> <br />4,000.00 <br /> Torah <br /> <br />Sile furnisMng.~ $ 27,800.00 <br /> <br />benche~: park: ,,\rcah] . poiy ';ue, backed + arms 4 E.A 2,000.00 8,000.00 <br />tro:~h receplocte~. - Io tnolch hnelChe~ 2 EA 1,000.00 3,000.00 <br />picnic table~ 12 EA 950,00 I 0,000.00 <br />drlnkin!) founlaln 4- ,ns'~oc~uted ptu~nbing 1 EA ' 5,000,00 S,O00.O0 <br />9rdle~' 4 EA 300.00 1,200.00 <br />bike purk~nL2 ;oc, p~ 6 IA 100.00 600.00 <br /> <br />lrrigafio~ Total: $ 60,000.00 <br /> <br />Landscap,-~ Improvements Total: $ 91],000.00 <br />luff seeding 3.80 AC 4,350.00 20,000.00 <br />tree,-. ~)lrui]s, fl~Jwer~ ~and other plrjnhng~ 150 EA 400.00 78,000.00 <br /> <br />TOTAL $ 1,251,480.00 <br /> <br />-349- <br /> <br /> <br />