Town Center 3rd Addition - Final Site Plan/Cobom's <br />October 7, 2004 <br />Page 2 of 10 <br /> <br />that the fuel pump island remains at 430 sq. ft.; the 1,777 sq. foot car wash is being eliminated; <br />comer retail store building is reduced from the preliminary site plan to 13,000 sq. ft.; and two <br />other commercial buildings have been increased to 20,000 square feet. The total amount of <br />building tbotprint proposed at preliminary site plan was 93,207; the proposed building footprint <br />total for Lot 1 on the final plans is 95,430 square feet. This is approximately a 2,200 square foot <br />increase in building square footage from the preliminary site plan. However, the proposed <br />building coverage is 'still deficient of .5 ratio and has been addressed with the variance to floor <br />area ratio approved by the Board of Adjustment on August 5, 2004.. <br /> <br />Setbacks: The proposed Town Center Zoning District has setback standards based on the <br />principle of %uild to" lines rather than traditional setbacks. The Board of Adjustment granted a <br />variance to the 15 foot maximum front yard setback for the Cobom's store. The placement of the <br />structure meets the 30 toot rear yard setback. <br /> <br />Storm Water Plan. We offer the following comments: <br /> <br />· The outlet structure for the pond shows a 2 ft orifice. This orifice is not reflected in the <br /> current storm water model. <br />· The details include an emergency overflow using tuff turf. This is not called out on the plans. <br /> Review of the grading plan shows that the lowest point on the rim of the pond is at least 1 <br /> root above the floor elevation of the building closest to the .pond. Please submit irkformation <br /> on the maximum probable pond elevation. Assumptions should include partial or complete <br /> blockage of the outlet and should be clearly called out in the summary. <br />· The 100 yr water elevation on the grading plans does not match the SWMM model. <br />· Inlet protection must be installed on all storm sewer structures as shown on the plans. <br />· Storm water ponding is done in regional ponds for RTC. Each site must implement Best <br /> Management Practices tbr storm water quality. Please provide details on the BMP's for this <br /> site. Particular attention must be made to the storm lines draining the filling station element. <br /> <br />Grading Plan: We offer the following comments on the grading plan. The italicized comments <br />were issued in the July 2004 review and have not been addressed in the current plans. <br /> <br />· Fhe minimum allowable slope on bituminous surfaces must be 1.0%. The minimum <br /> slope on concrete surfaces is 0.5% <br />· 3)pot elevations shoulJoec~ top or bottom of curb. <br />· .~l~t~rimum cross slope in drive ahles should be 2.0% <br />· 3'i.~ned engineering drawings will be need to be submitted to the building inspe:~ion <br /> c[epartment for review 9riot to approval ~['this concept. <br /> <br /> <br />