Laserfiche WebLink
Final Site Plan Reivw - Comer Retail Building Town Center 3rd Addition <br />October 7, 2004 <br />Page 3 at' 8 <br /> <br /> · Grade transitions should be smoothed out, the current plans show grade changes of <br /> 2%+ on different sides of contour lines. ' <br /> · The grades across islands must be reviewed. We observed grade differences of more <br /> than 1 ~'oot across narrow areas of islands. <br />· The 100 yr water elevation on the grading plans does not match the SWMM model. <br /> Sheet Specific Comments <br />· Page 25, 26 Sho~v more spot elevations along Sunwood Drive. <br />· Page 26 Check spot elevations. Provide spot elevation at CBMH 19. <br />· Page 30 Typical sections through walls are not referenced on plans. Railing must be shown on the top of' section 3. <br /> Signed engineering plans are required for all retaining walls. <br />· Page 66 Revise spot elevation locations to match curb locations. <br /> <br />Utility Plan. We offer the following comments: The italicized comments were issued in the <br />July 2004 review and have not been addressed in the current plans. <br /> <br />· Please submit exhibits showing the landscaping superimposed on the utility plan. <br />· Please submit 8 V2 x 11 detail sheets at a scale of 1" = 4' or less for areas where pipe <br /> conflicts may exist, it. watermain in close proximity to sanitary or storm sewer <br /> structures, pipes at same elevation, hydrants in islands near other pipes. Minimum <br /> horizontal separation between hydrant barrel and storm pipes is 18". <br />· Coordinate with the ~F[S,4 plans to remove the sanitary sewer and water service along <br /> Armstrong Boulevard west of the pond. <br />· The proposed watermain layout is being reviewed by the city consultant to verify <br /> adequacy of hydrant flows. This information may not be available before-this review <br /> letter is sent. The reszdts of the review will be sent to (YRS. <br />· Thefire inspector is reviewing the hydrant layouty~br coverage of the site. Comments <br /> will be provided during the review process: The parking stall in front of a hydrant <br /> located behind the curb must be signed "No Parking" and the stall marked with paint. <br />· The storm water plan approved with thefinalplat of Ramsey Town Center is being <br /> modified to allow more room for development on this site. &Jettings have been held <br /> to resolve the changes. The changes included making the southwest pond smaller, <br /> increasing the size of other poncts and changing pipe sizes and alignments. Details to <br /> be resolved include verifying that there is adequate clearance between the pipes after <br /> the change in size, verifying the clearance around the new manholes and verij~v, ing <br /> cover over the pipe. These issues were discussed at a meeting held July i, 2004 and <br /> work was to start on checking these specific issztes. <br />· The regional pipe that the pond outlet connects to must be installed and operational <br /> prior to release of certificates o~'occupancy. <br />· Detail of the cotmection between the retaining walls and the storm sewer pipes <br /> draining to the pond is not provided. Submit construction detail for these elements. <br /> <br /> <br />