My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 10/10/2002
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
2002
>
Minutes - Planning Commission - 10/10/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 4:03:52 PM
Creation date
5/5/2003 3:15:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Date
10/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
commercial lot. The Development Agreement allows for the subject property to be developed <br />with a use allowed under either a B-1 or B-2 Business zoning classification. Multi-tenant office <br />uses are allowed in both the B-1 and B-2 Business Zoning Districts. The building location <br />exceeds the 35-foot front and rear yard and 20-foot side yard setback requirements. City Code <br />requires a 20-foot green space area adjacent to all public roads. The site plan shown does not <br />meet this requirement. The parking area is shown as close as ten feet from the edge of the right- <br />of-way. In addition, City Code requires the developer to provide a 40-foot landscape buffer <br />along the property line when adjacent to a residential area, as is the case on the eastern border of <br />the site. The site plan as shown does not meet this requirement. The applicant has applied for a <br />variance from both the 20-foot green space and 40-foot buffer area requirements. The variance <br />will be considered at the October 3, 2002 Board of Adjustment meeting. The building elevation <br />plan indicates that the exterior wall materials for the office structure will consist of faux <br />ledgestone and stucco, which meets City requirements. The landscaping plan provided to the <br />City has been reviewed and found acceptable. Staff does have some concerns regarding the <br />existing bituminous path on the property as referenced in the staff review letter and are asking for <br />some corrective action regarding the alignment of the trail. The development is proposing to <br />derive one access point onto 137th Ave., which is acceptable to the City. <br /> <br />City Engineer Jankowski showed a sketch plan to the Commission and stated the revised plan is <br />generally acceptable. He stated there are a couple of items that need attention, one is the fact that <br />all the water drains into the low area by the spillway and the water no longer gets to the low spot, <br />but there is still a low spot and it should be graded. He stated the other issue is that there should <br />be a few extra dimensions placed on there. There is only one catch basin on the east side of the <br />entrance and he assumes it is the developer's intention to have the water from the west side of the <br />drive head over to the east side to the catch basin but there is not sufficient elevations on there to <br />document that. He stated this site plan also needs to be reviewed by the WMO for compliance <br />with their water quality standards. He stated his understanding is that the pond the storm sewer <br />discharges into is large enough for that but the WMO would have to verify this. <br /> <br />Chairperson Nixt asked what kind of drop in elevation would be needed from the west side to the <br />eastern edge of the property. <br /> <br />City Engineer Jankowski stated the elevations on the concrete curb and gutter are a half a <br />percent, which is the minimum for concrete curbing for gutter. The site would benefit if the <br />building were raised any amount and be able to have a little bit more fall away from the building. <br /> <br />Chairperson Nixt asked what other comments could he add in reference to the applicant. <br /> <br />City Engineer Jankowski stated the WMO plan and addition of the documentation at the entrance <br />showing the water drains into the east side of the property into the catch basin rather than onto <br />the City Street. He stated the elimination of the puddle in the ditch line, regrading of the County <br />ditch line would be required and the exit piping is not entirely on a drainage and utility easement. <br /> <br />Planning Commission/October 10, 2002 <br /> Page 4 of 20 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.