My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Common Excavation — Payment shall be made on a per cubic yard basis as compensation for <br />all equipment, material, and labor costs required for the excavation, loading, removal, <br />transport, placement and disposal of on -site borrow material as directed by the Engineer. The <br />limits for quantity determinations will not extend beyond the authorized grading sections as <br />staked, except as authorized prior to the work by the Engineer. <br />11. Granular Borrow — Payment shall be made on a per cubic yard basis as compensation for all <br />equipment, material, and labor costs required for the excavation, transport, and placement of <br />granular borrow material at a location directed by the Engineer. <br />12. Dewatering — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of any dewatering <br />measures. <br />13. Furnish and Install Aggregate Base Class 5 — Payment shall be made on a per cubic yard basis <br />as compensation for all equipment, material, and labor costs required for the loading, <br />transportation, placement, and compaction of aggregate base. Aggregate base from the City <br />stockpile located at the City Public Works campus, 14210 Jaspar Street, shall be used. The <br />Contractor shall furnish a loader and operator to load and haul from the stockpile. <br />14. Furnish and Install PVC Sanitary Sewer Pipe — Payment shall be made on a per lineal foot <br />basis as compensation for all equipment, material, and labor costs required for the installation <br />of PVC sanitary sewer pipe based upon size. <br />15. Furnish and Install PCV Sanitary Sewer Pipe Plug — Payment shall be made on a per each <br />basis as compensation for all equipment, material, and labor costs required for the installation <br />of PVC sanitary sewer pipe plug based upon size. <br />16. Connect to Existing Sanitary Sewer Manhole — Payment shall be made on a per each basis as <br />compensation for all equipment, material, and labor costs required to connect to the existing <br />sanitary sewer manhole. <br />17. Clean and Video Tape Pipe Sewer — Payment shall be made on a per lineal foot basis as <br />compensation for all equipment, material, and labor costs required to clean and video tape the <br />sanitary sewer pipe. A copy of the video shall be supplied to the City. <br />18. Furnish and Install Gate Valve and Box — Payment shall be made on a per each basis as <br />compensation for all equipment, material, and labor costs required for installing gate valves <br />and box based upon size. <br />19. Furnish Hydrant — Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for furnishing hydrants. <br />SP 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.