Laserfiche WebLink
E. Requests by the Owner or Engineer for additional water to be placed for dust control shall be accomplished <br />within 4 hours of notification and shall also include evenings and weekends as required or deemed <br />necessary by the Owner or the Engineer. Failure to perform the work requested within the 4 hours may <br />result in the Owner or Engineer arranging for dust control by others. A contract deduction shall be made <br />equal to the total of all costs to perform dust control so arranged, including not limited to labor, <br />materials, equipment and administrative costs. <br />3.3 USE OF CHEMICALS <br />A. Reference Storm Water Pollution Prevention Plan (SWPPP). <br />****END OF SECTION**** <br />City of Ramsey - R16.111092 AIR, LAND AND WATER POLLUTION <br />April 5, 2017 PAGE 01562-2 <br />V040110 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />