SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 16 <br />SP 0202-101 <br />(H) The Contractor shall keep the Right -of -Way fence closed up, except during work hours, by means <br />of the in place fence, newly constructed fence, temporary fence (at the Contractor's expense), or a combination <br />thereof. <br />(I) No access to or from any public road will be permitted for the Contractor's equipment, material <br />deliveries, the hauling of excavated materials of any kind, or employees' private vehicles, except at in place public <br />road intersections, or at locations and in such manner as approved by the Engineer <br />(J) As each road is completed, the Contractor shall install the final signing and pavement markings <br />required to safely open that road to traffic. This work shall be completed on or before the date of opening as <br />approved by the Engineer. Overhead signs may be temporarily ground mounted at the Contractor's expense. <br />S-12.8 MEASUREMENT AND PAYMENT <br />Traffic Control will be measured and paid for as follows: <br />Payment for furnishing, installing, maintaining, relocating and subsequently removing traffic <br />control devices (including naggers) as required will be made as a lump sum under Item 2563.601 (Traffic Control) <br />and according to the following schedule: <br />(1) When 5 percent of the Contract amount is earned, 50 percent of the amount bid for traffic <br />control will be paid. <br />(2) When 10 percent, or more, of the Contract amount is earned, an additional 25 percent of <br />the amount bid for traffic control will be paid. <br />(3) When 50 percent, or more, of the Contract amount is earned, an additional 20 percent of <br />the amount bid for traffic control will be paid. <br />(4) The remaining 5 percent bid for traffic control will be paid when all work has been <br />completed and accepted. <br />(5) In all items above, the original Contract amount shall be the total value of all Contract <br />Items including the traffic control item, but the percentage earned in each case shall be <br />exclusive of the traffic control item. <br />S-13 (1514) MAINTENANCE DURING CONSTRUCTION <br />The provisions of MnDOT 1514 are supplemented with the following: <br />In addition to the requirements under MnDOT 2051 (Maintenance and Restoration of Haul <br />Roads), the Engineer may require additional sweeping of roads adjacent to the construction site to ensure safety for <br />the traveling public, protect the environment, uphold local requirements, or as otherwise directed by the Engineer. <br />Payment for additional sweeping ordered by the Engineer is specified below. (This price <br />represents a shared cost.) <br />Pick Up Broom W/Operator $55.00 per hour <br />Self Propelled Pavement Broom W/Operator $30.00 per hour <br />S-14 (1701) LAWS TO BE OBSERVED (WET LANDS) <br />The provisions of MnDOT 1701 are modified and/or supplemented with the following: <br />