My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: 17-127: Bunker Lake Industrial Park Addition <br />Final Plat Review <br />Page 4 of 5 <br />feet of windows, and about 3 foot tall parapets. Between each of these entries is a pedestrian door and two precast panels the <br />same color and texture as the precast panels at the entries. <br />Standard Re. uirement Lot 1 Lot 2 <br />Minimum <br />Setback <br />Front Yard <br />Minimum <br />Setback <br />Rear <br />Yard <br />Minimum <br />Setback <br />Side <br />Yard <br />Building Height <br />Buildin • Size <br />Lot Coverage <br />1 Acre <br />200 feet <br />N/A <br />4.442 Acres <br />473.32 Feet <br />412.02 Feet <br />4.512 Acres <br />540.35 Feet <br />375.38 Feet <br />35 feet <br />159 Feet 2 Inches <br />103 Feet <br />35 feet <br />90 Feet <br />72 Feet <br />20 feet <br />45 feet 6 Inches 69 Feet <br />65 feet <br />N/A <br />45 percent <br />31 Feet 6 Inches <br />56,000 Square Feet <br />28.94% <br />32 Feet 8 Inches <br />64,000 Square Feet <br />32.56% <br />• <br />Streets/Access. Two new streets are proposed as part of the subdivision: Jackal Street NW and 147th Lane NW. Jackal Street <br />will run roughly north to south and will connect the existing Bunker Lake Blvd with the proposed 147th Lane NW. 147th Lane <br />will run roughly in an east to west direction and run roughly parallel and about 450 feet south of Bunker Lake Road. All access <br />for the two buildable lots will be gained from 147th Lane NW, while Lot 1's access to 147th Lane will be through a private drive <br />that is located halfway onto Outlot A. The proposed streets are satisfactory to staff. <br />The Final Plat is requesting a vacation of Puma Street NW. The Comprehensive Plan does not illustrate the extension of Puma <br />Street beyond the existing railroad track and does not show an intersection with MN Highway 10. Therefore, staff supports the <br />requested vacation. The vacation of Puma Avenue will require a public hearing at the City Council meeting approving the Final <br />Plat. <br />There is a gravel access drive (by others) shown running roughly parallel with Jackal St and about a couple hundred feet west of <br />Jackal St. It is unclear what the purpose of this access drive is and would be redundant with Jackal St. If this access drive is used <br />to access the construction site on Lot 1 and 2 during the road construction of Jackal St and 147th Lane, then the gravel access <br />drive should be removed upon completion of the Jackal St construction. <br />Utilities/Wells. All new lots created by this subdivision will be served by city sewer and water, and plans have been submitted <br />indicating the extensions. No well locations are shown as the property is proposed to be connected to city utilities. Building <br />setbacks are shown on the site plan, and the drainage and utility easements are shown on Final Plat. Beyond the standard drainage <br />and utility easement dedicated on Lot 1 and Lot 2 of Bunker Lake Industrial Park, there are drainage and utility easement over <br />the waterline leading to the fire hydrants. Separately, stormwater easement will be recorded on Lot 1 and Lot 2 to allow for the <br />installation and maintenance of the stormwater pipes necessary to convey the stormwater to the pond located on Outlot C. <br />The grading plan shows a ditch being constructed to the west of the cul-de-sac for 147th Lane, then running north to Bunker <br />Lake Blvd and the turning east and running through a culvert under the new Jackal Street (end of Outlot B) and onto the <br />northeast corner of Outlot A and into the culverts under Bunker Lake Blvd. A drainage and utility should be dedicated over this <br />drainage ditch in addition to a drainage and utility easement will need to over the entirety of the stormwater pond being <br />constructed on Outlot C. All other easements for the Outlots will be taken prior to building on the lots, at the time of re - <br />subdivision. <br />Development Fees. The Developer will be required to pay development fees consistent with the City's approved schedule of <br />Rates and Charges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.