My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/11/1988
Ramsey
>
Public
>
Agendas
>
Council
>
1988
>
Agenda - Council - 10/11/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:28:33 PM
Creation date
12/7/2004 10:38:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/11/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gerald Zimmerman <br />Page 2 <br />September 30, 1988 <br /> <br />B-1 Business District Zoning specifies a setback of 35 feet for <br />the rear yard. In this case with Highway 10 frontage, the <br />applicant contends that the area behind the building should be <br />viewed as a sideyard (setback would be 20'). The site plan <br />shows a setback of 12 feet from the east side of the lot. The <br />setback would need to be corrected or a variance would have to <br />be granted. <br /> <br />city Code 170.D15F requires the finished lot grade elevation of <br />all buildings to be a minimum of 18 inches above the centerline <br />grade of the adjacent public roadway. The grading plan <br />indicates a slab elevation of 865. <br /> <br />The applicant's estimated water usage appears to be excessive <br />and should be re-evaluated for design of the septic system (see <br />attached letter). <br /> <br />Particular attention needs to be given to stormwater runoff and <br />holding~o_ ~ ~ this property. A drainage easement may be required <br />dependent on submittal of final grading plans. <br /> <br />The building information and preliminary plans appear to be <br />consistent with the intent of city Ordinances. The applicant <br />will require a CUP for the proposed advertising sign. <br /> <br />10. No soil borings or perc tests have been conducted as yet. The <br /> applicant has indicated that final plans would be submitted <br /> contingent upon City approvals. All final plans must be <br /> certified by an architect or engineer. The applicant has <br /> indicated that, if approved, he intends to start construction <br /> ne>:t spring. <br /> <br />Recommendation: <br /> <br />~.~e ~ecommend tabling action on this item unti~ such time <br />traffic concerns and site drainage have been sufficiently <br />addressed. <br /> <br />Sincerely, <br /> <br />ANDERSON ASSOCIATES, INC. <br /> <br />l~fer~nd Otto <br />/~!c <br />r~!e: ~%2:~5-67 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.