My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 02/26/2002
Ramsey
>
Public
>
Minutes
>
Council
>
2002
>
Minutes - Council - 02/26/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:18:22 AM
Creation date
5/6/2003 10:50:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
02/26/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the required concrete curbing. The applicant would like to construct a future addition within the <br />next 3 to 5 years that would consist of approximately 25,000-35,000 square feet of <br />office/warehouse space. The applicant would like to deviate from the City Code requirement to <br />install concrete curbing around the perimeter of the loading berth area since they would like to <br />construct a future addition off the rear of the principal building. Deviation from the required <br />concrete curbing will require City Council approval. The proposed development is subject to the <br />review and permitting of the Lower Rum River Watershed Management Organization (WMO). <br />The exterior building materials for the principal structure are proposing to consist of rock face <br />concrete block with a pre-fin/shed metal coping accent; this meets City Code requirements. The <br />landscaping plan is acceptable. The facility will be served by on-site sewer and water facilities. <br />The City adopted the 2001 Comprehensive Plan on December 18, 2001. The Comprehensive <br />Plan includes a general policy stating that new commercial/industrial developments should be <br />serviced by urban services. Since municipal services are not available to the site, staff <br />recommended that the development permit require connection to urban services within two years <br />of availability. The Minnesota Department of Transportation has initiated a TH 10 Interregional <br />Corridor Management Plan for State Highway #10. Howard R. Green Company made a <br />presentation to the City showing different options for the portion of Highway #10 located in the <br />City of Ramsey. The exact alignment of the freeway has not been determined, however, MnDOT <br />has stated their preference for the northernmost alignment that would be located immediately <br />adjacent to the BNSF Rail system. The City Council adopted a resolution on January 8, 2002, <br />stating the City's support for the TH 10 Interregional Corridor Management Plan to convert TH <br />10 to a fi'eeway system. It was noted that the adopted resolution does not specify a preferred <br />alignment. Converting State Highway #10 to a freeway could have a substantial impact on the <br />property. The applicant is aware of the TH 10 study and has decided to proceed with <br />development plans. The Planning Commission reviewed the proposed site plan on February 7, <br />2002. The Planning Commission recommended approval of the site plan contingent upon <br />compliance with City Staff review letter dated February 21, 2002. <br /> <br />City Attorney Goodrich noted that site plan approval would need to be contingent on the <br />Comprehensive Plan amendment, rezoning, and approval of final plat of Ramsey Industrial Park. <br /> <br />City Engineer Olson noted that staff is recommending that the curb be installed at the loading <br />berth at this time. <br /> <br />Community Development Director Frolik noted that there have been cases in the past where <br />there was a definite proposal for expansion so the curbing requirement for that expansion area <br />was waived. <br /> <br />Councihnember Anderson inquired as to what impact it would have on drainage if there is no <br />curbing. <br /> <br />City Engineer Olson explained that there were two reasons staff was recommending that the <br />curbing be installed. One is that east of the building there is a catch basin and without curbing <br /> <br />City Council/February 26, 2002 <br /> Page 12 of 35 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.