Laserfiche WebLink
consulting eh© neers d vers ed nc, <br /> p.o. box j. osseo, minnesota 55369 L~ (612) 425-2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />Mr. Lloyd Schnelle <br />April 11, 1979 <br />Page Four <br /> <br />"Any proposals for joint use of sewage facilities with other communities." <br /> <br />Plans that have been prepared for the:MWOC are based upon an assumption that the <br />Anoka WWTP will be phased out and they include a temporary force main and lift <br />station to convey waste from the CAB Interceptor to the Anoka WWTP. The temp- <br />orary facilities would be owned by the City of Anoka. <br /> <br />The Northwest Area Study will include evaluation of the Anoka WWTP as a part of <br />the metropolitan disposal system. Should that plant survive the evaluation, <br />Ramsey would use no facilities jointlY with other communities. <br /> <br />If the temporary facilities are construct.ed by Anoka, it is possible that <br />Ramsey may have need to share in the cost of and utilize the temporary facilities. <br /> <br />"Description of any privately-owned treatment facilities (e.g., mobile <br />home park plants, etc.)": <br /> <br />There are no privately-owned wastewater treatment facilities in the City that <br />discharge effluent to surface waters. There is a system owned by a mobile home <br />park located near the proposed west leg of the Anoka Interceptor. All that is <br />known about the system is that it is a septic tank soil absorption system that <br />has been in service for approximately ;20 years. <br /> <br />"Estimated sewered population by Year for the next five years (from <br />the desired date of initial metroPolitan sewer service)" <br /> <br />The March 8 memorandum indicates that ~sanitary sewer service will not be <br />available until 1984 which is five years from now. The entire issue is addressed <br />in Chapter IX of the Comprehensive Sewer Plan. <br /> <br /> "Projected sewered connections and/or residential equivalent connections <br /> by year for the next five years (from the desired date of initial <br /> metropolitan sewer service)." <br /> <br />It is impossible to make any meaningful projection of this kind of information <br />for a period beginning five ?years from now. When the Metropolitan Council predicts <br /> <br />keith caswell jr. [] darrell schneider ~J richard sha <br /> <br /> <br />