Laserfiche WebLink
~harges and Fees. The Permit Holder agrees to pay to the City <br />upon the issuance of this permit a fee in an amount sufficient to <br />reimburse the City for engineering, legal and administrative <br />expenses incurred during the consideration and development of this <br />Conditional Use Permit. The Permit Holder shall reimburse the <br />city for all city official and consultant fees incurred by the <br />city in connection with inspection of landfill operation, <br />administration of this permit, testing evaluation and all other <br />such expenses incurred by the City in connection with the landfill <br />operation. Such expenses shall be reimbursed to the City upon <br />receipt of invoice with supporting documentation. <br /> <br />On-Site Demolition Debris The permit holder agrees that only <br />concrete waste products.produced on-site in Ramsey shall be <br />disposed of in the demolition landfill. <br /> <br />Toxic or Hazardous Materials. No paints, solvents, cleansers or <br />onher toxic or hazardous contaminants in a liquid state shall be <br />disposed of in the demolition landfill. <br /> <br />Stockpiled Materials. Stockpiled cover material shall be stored <br />outside of the existing and planned runway clear zones and at a <br />height of not greater than 10 feet with adequate erosion, sedimen- <br />tation, and dust control measures in place to assure that there is <br />no pollution of any water body or water course, health hazard or <br />nuisance. <br /> <br />Cover Material. Cover material will consist of earth, loam, clay, <br />sand, or a mixture of at least fifty percent (50%) earth and other <br />inert materials such as cinders or gravel unless othe~,ise <br />specified by the County or MPCA. A minimum depth of twelve inches <br />(12") of compacted cover and final spread cover material shall be <br />kept on all inactive faces of the landfill at the end of all <br />operations or as otherwise directed by the City. <br /> <br />......=:~{sh Grade. When the ~an~ .... has been broucht~ up. to ~wc feet <br />(2') b~;ow %he desired finishe~ credo i~ she!~ be covered with -t <br />!eas~ twelve inches (12") cf ccmmactea c~x~_ material and 12" cf <br />ncmsci!. Topsoil_ _.=ha%__~ be am:roved., bvo the Ci~v~ -...r~cineer prior to <br />rlacinz and seeding. <br /> <br />1O. Sine Eeicht Limitation. The final maximum elevations of the <br /> iangfi!! site shall no% exceed ~he adjacent natural ground <br /> elevation bv more nhan 7 feet unless c~her~ise restricted by FAR <br /> Par5 77 surfaces within the clear zones of the airport. Final <br /> slopes for nhe =~ area must be a minimum of two percent (2%) and <br /> a ~.~>.~ ..... ~wenty percent (20~). <br /> <br />E:~ ~=5-~-~ons There shai~ ' - ' ' ~_ <br /> ..... ~ De no seepage o craznage ~= any <br />mane~=~ =rom ~'ne fll%_ cf such =- nature as would constitute an <br />.... canoe cr health hazard cr po!}~'= any water course. <br /> <br />2 <br /> <br /> <br />