My WebLink
|
Help
|
About
|
Sign Out
Home
05/08/17
>
Comprehensive Plan
>
2040 Steering Committee
>
Agendas
>
05/08/17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 9:42:41 AM
Creation date
3/13/2018 9:42:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />all citizens to easily navigate the 3 <br />No additional resources <br />completed, finalized in <br />Resources/Progress <br />Draft flyer has been <br />All steps completed <br /> <br />effective, and efficient government services <br /> <br />except flyer. next 60 days. <br /> <br />Additional requested. <br /> <br />Notes <br /> <br /> <br /> <br />Responsible <br />Ensure that the city is a connected city that is part of a comprehensive regional transportation system that enables <br /> <br /> <br /> <br /> <br />Brama <br />Ulrich <br />Party <br />UlrichUlrich <br />secured for high priority <br />Preliminary Design and Engineering in regard to <br />2 page flyer (marketing material) summary of <br />Access <br />be communicating with (lobbying) <br />Policy Packet for next Highway 10 projects in <br />Allocation of up to $10 M in state bonding for <br /> <br /> project webpage on City website. <br />Planning Study projects are commenced. <br /> <br /> <br />willing to assist in lobbying established. <br />MnDOT/Anoka County US Highway 10 <br />- <br />our community, and to provide quality, cost <br /> <br />Preliminary design for Highway 10. <br /> <br />2017 Update (April 25, 2017) <br /> <br />Key Outcome Indicators/Metrics <br /> <br /> <br />State and federal fundingTH Highway 10 projects. <br />Strategic Action Plan <br /> <br />ISSION <br /> <br /> <br />Highway 10 <br />established. <br />City should <br /> <br /> <br />Ramsey. <br /> <br />projects. <br />d <br />M <br />Create <br />- <br /> 1 <br /> <br /> <br />December 2018December 2018 <br />Completion <br /> <br />May 2018 <br /> <br /> <br /> <br />A Connected Community <br />2017 <br />Date <br />To work together to responsibly grow <br /> <br /> <br />community and attracts business development. <br /> <br /> <br />Initiation Date <br />Summer 2015 <br /> <br />March 2015March 2015March 2015 <br />to construct Highway 10 corridor Sunfish Lake Blvd. Initiate a regional in regard to <br /> <br />effort to complete <br />Highway 10 Study <br />State Legislature <br />Actively lobby Engineering and <br />rail intersections.communications <br />requesting state <br />Congressional Environmental <br /> <br />projects of the <br />Delegation for <br />Develop a <br />Review for all <br />separation at improvements <br />the identified <br />Ramsey and <br />and Federal <br />) Introduce rail <br />Highway 10 <br />Preliminary <br />: <br />funding for <br />legislation <br />I <br /> <br />- <br />Strategic Imperative I strategy <br /> <br />priorities <br />highway <br /> <br />Tactics <br />0M <br />10) <br />$17 <br />7) 9) <br />8 <br />Improve the <br />major road <br />mobility of <br />safety and <br /> <br />Strategic <br /> <br />corridors <br />. <br />Initiative <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.