My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #01-01-023 - 01/23/2001
Ramsey
>
Public
>
Resolutions
>
2001
>
Resolution - #01-01-023 - 01/23/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:05:42 AM
Creation date
3/16/2018 12:37:55 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#01-01-023
Document Date
01/23/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cost and expense of repairing any public right of ways or regrading and stabilizing eroded <br />areas due to the grading operation, pay for any cost associated in administering the <br />requirements of this Chapter of the City Code, and to pay for any restoration of the <br />worksite not properly restored upon completion. <br />11. The Permit Holder shall implement sediment and erosion control practices. No grading <br />activity shall occur within twenty -five (25) feet of a property line unless silt fence is <br />placed along the property line to prevent sediment from washing onto the adjoining <br />property. Any erosion which causes gullies of greater than one (1) foot within twenty - <br />five (25) feet of a property line shall be regraded within forty-eight (48) hours of the <br />precipitation event that caused the erosion. <br />12. There shall be no stockpiling of graded materials, other than the topsoil on a temporary <br />basis, allowed within the boundaries of the Subject Property. Topsoil stockpiles shall not <br />exceed 900 cubic yards in total nor six (6) feet in height. <br />13. Imported materials are restricted to topsoils and shall be subject to the prior approval of <br />the City Engineer. <br />14. The permit holder shall file with the City a liability insurance policy or certificate of such <br />insurance acceptable to the City and issued by an insurance company authorized to do <br />business in the State of Minnesota. <br />a. The policy shall insure the permit holder for the sum of at least $300,000 for injury to <br />one person and $500,000 for one accident, and at least $1,100,000 property damage. <br />b. Said policy shall be for the full period of the permit and shall provide for the giving of <br />10 days prior notice to the City by registered mail of termination, cancellation or <br />amendment of the policy. <br />c. In the event said policy is terminated for any reason, the permit shall be automatically <br />suspended upon the day the policy terminates unless a new policy complying with <br />this item is obtained and filed with the City prior to the termination of the policy in <br />force. <br />15. The maximum noise level at the perimeter of the worksite shall be within the limits set by <br />the Minnesota Pollution Control Agency and the Environmental Protection Agency of the <br />United States. <br />16. The Permit Holder shall stage grading operations numerically in accordance with the 13 <br />sub -areas identified in the Phasing Plan prepared by Ulteig Engineers, Inc., dated January <br />12, 2001, and no more than two (2) sub -areas shall be exposed at any single time, unless <br />otherwise approved by the City Engineer. Restoration operations shall be coordinated to <br />achieve this goal. <br />17. All restoration shall consist of spreading a minimum of four (4) inches of topsoil, <br />fertilizer, seed and mulch. <br />18. All costs incurred by the City in executing and administering this permit shall be the <br />responsibility of the permit holder. The permit holder shall maintain a minimum Five <br />Hundred Dollar ($500.00) balance in an escrow account with the City. This escrow shall <br />be used to reimburse the City for expenses incurred in the administration of this permit. <br />At the time the mining operation and site restoration are completed to the satisfaction of <br />the City, the balance of the escrow shall be returned to the Permit Holder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.