My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/06/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 08/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:54:36 PM
Creation date
9/11/2018 8:53:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/06/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- US 10 Interchange at CSAH 57/Sunfish Lake Boulevard <br />- US 10 Interchange at Thurston Avenue <br />- US 10 Interchange at Main Street <br />- US 10 Interchange at TH 47 <br />U.S. Highway 10 Access Planning Study <br />MnDOT and Anoka County, in cooperation with <br />the Cities of Ramsey and Anoka, conducted the <br />Highway 10 Access Planning Study to re-examine <br />and identify the ultimate amount of access, types <br />of access and locations of access to Highway 10 <br />between the Anoka/Sherburne County line and <br />the Rum River. Based upon traffic volumes and <br />safety concerns along this stretch of Highway 10, <br />project partners agree a freeway is the proper <br />vision for this corridor. A final study report was completed in August 2014. <br />Considering current overall state and federal funding levels, it will be difficult to achieve <br />the vision of a freeway facility on this portion of Highway 10 in the next 20 years. To reduce <br />crashes and improve mobility issues, it is reasonable and responsible to implement lower - <br />cost, interim measures that increnn�tally improve safety and operations for all users of <br />the Highway 10 corridor. <br />This study was completed so that high -benefit improvements that are fiscally responsible <br />could be identified so that improvements can be funded, programmed and implemented <br />incrementally to improve the corridor's mobility and safety, for motorists and pedestrians, <br />in a timely manner. <br />1-35 Corridor Management Plan <br />MnDOT completed the 1-35 Corridor Management Plan in 2005. The plan includes <br />recommendations for improvements for the 1-35 corridor from the 1-494/1-694 Twin Cities <br />Beltway to TH 48 in Hinckley. The plan recommended the following improvements within <br />Anoka County: <br />» Expand I-35W from US 10 to Lexington Avenue to eight lanes <br />» Expand I-35W from Lexington Avenue to CSAH 14/Main Street to six lanes <br />» Expand 1-35 from I-35W/E split to TH 97 to eight lanes <br />» Expand I-35E from Ramsey CSAH 96/County Highway G to CSAH 14/Main Street to <br />six lanes. <br />ANOKA COUNTY 2040 TRANSPORTATION PLAN UPDATE CHAPTER 6 - IMPROVEMENT STRATEGIES AND IMPLEMENTATION 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.