My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 03/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:46:16 PM
Creation date
3/18/2005 11:51:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) <br /> <br />(5) <br /> <br />(6) <br /> <br />Total estimated conStruCtiOn cb:St oflthe Improvements described in the Schedules is <br />$13,050,372.08. Th~se figures are based on the City estimates included in the "Summary <br />of Estimated ProjectlCosts for ~the Ralnsey Town Center Improvements" incorporated <br />herein by reference; TheprojectiCos~ shall be paid for by special assessments, City <br />funds, State funds, l~deral funds and',County contributions as hereinafter provided. The <br />projects for which the costs are to be Shared by the County and the City, the estimated <br />total cost;of each Pmjecti and {he COunty participation in each project is listed in the <br />Schedules of this Agreement. : <br />The estimated costs for the signal Pr~ojects are $2,801,250 of which $1,012,500 is on T.H. <br />10. The remaining ~1,788,750 in estimated signal costs are on County highways. Since <br />only two of the sigr~,al systems!on the!County highway system are warranted, the County <br />will not participate !n thei~ eofistmctibn of unwarranted signals. The county will <br />participate in constt34ction of a~nd Wi!lI provide ongoing maintenance for the signal <br />systems at Armstrong Bouleva. rd (CS~I-183) at Bunker Lake Boulevard (C.R. 116) and <br />Ramsey Boulevard ~(CSAI-IICR 57) at Bunker Lake Boulevard (CSAH 116), in <br />accordance with tho County cost sharing policy. <br /> <br />(I) The City shall submit plans if.Or each signal system, including EVP, to the County <br /> <br /> for review and apprOval sixty (60) days prior to the advertising for bids. The <br /> City shall ~'y t° the CoUnty a plan review fee of $1,000 for each signal plan <br /> sUbmitted. <br /> <br />(2) At a rate ofrSix percent (6%) Of the actual construction costs, the County shall <br /> provide cOnStructiOn °bserV~tion for the construction of the signal system. The <br /> County shall have final authority to accept all roadway and signal work done <br /> within the e0untyrigl!t of Way. The estimated cost to the City for construction <br /> observation js $107,325. <br /> <br />(3) The City shall be reSpbnsibielfor all remaining construction and engineering <br /> costs. <br /> The cost p~icipati°niis summarized below: <br /> <br /> Anoka CoUnty: $0 <br /> City of Ramsey, Signal COnstruction Inspection: $107,325 <br /> City of Rarnsey: ALL REMAINING COSTS <br /> The total c°st to the City for the signal inspection is estimated at $107,325. <br /> Upon award of the Contract for each signal, the City shall pay to the County, <br /> upon written demand by the County, ninety five percent (95%) of its portion of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.