My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 09/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:33 PM
Creation date
9/11/2019 4:04:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Address 953 Westgate Dr. <br />Suite 101 <br />St. Paul MN 55114 <br />Phone 612-697-7232 <br />O gelled Technologies <br />turn to the experts <br />Fax (860) 755-4608 <br />E-mail quincey.moman@carrier.utc.com <br />Contact Name Dan Bray <br />Account CITY OF RAMSEY <br />Phone (763) 433-9815 <br />Site Address 7550 Sunwood Dr NW Estimate Date 08/19/2019 <br />Anoka, MN, 55303-5137 <br />Quote Number 00493026 <br />Job Description B - 30XA 240 Ton Discharge Valve Replacement <br />Scope of Work <br />Carrier is pleased to provide to you our proposal to replace the leaking discharge valve on the A circuit on Carrier M:30XAA2406F-0-073 & S: <br />4905Q90522. Carrier will reclaim the remaining refrigerant from the A circuit and weigh it to see how short of factory charge this circuit is <br />holding. Carrier will pressurize the system and remove oil from oil separator. Carrier will remove the defective discharge valve and install the <br />new discharge valve. Carrier will then pressure test and leak check circuit A. Once there are no leaks found we will pump in the new factory oil <br />charge. Carrier will then perform nitrogen test and evacuate the system. When the vacuum test pass we will install the remaining charge that was <br />weighed and recovered, start, and verify operation. Carrier will also provide a change order proposal once the refrigerant is weighed to purchase <br />the remaining amount of refrigerant needed to bring this circuit back to the factory charge. <br />Exclusions / Clarifications <br />This quote does not include the waste disposal and labor performed outside normal business hours unless otherwise noted. In addition, the quoted <br />price does not include any sales, excise, or similar taxes, any that apply will be added at cost. <br />The proposal excludes refrigerant so any additional refrigerant that is required will be quoted separately. <br />Total Quoted Price <br />Total Price for Scope of Work excluding applicable taxes: $9,410.00 <br />This proposal is valid for 30 days from the date of proposal. Carrier's terms and conditions will govem in lieu of any other terms and conditions <br />contained m any resulting Purchase, Order, Contract, Agreement, etc. Carrier would like to thank you for the continuing opportunity to be of <br />service. <br />Sincerely, <br />Quincey Moman <br />Carrier Commercial Service <br />Customer Acceptance (signature) <br />The attached Terms & Conditions shall govem. <br />Title <br />Date Purchase Order <br />Quote #00493026 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.