Laserfiche WebLink
CONSIDER POTENTIAL ALIGNMENT OF <br />167TM AVENUE NW BETWEEN CSAH 5 AND CR 83 <br />By: Steven J. Jankowski, City Engineer <br /> <br />PW CASE <br /> <br />Background: <br /> <br />At a recent Planning Commission meeting several residents appeared to request that the <br />proposed extension of 167th Avenue between CSAH 5 and CR 83 as a future collector <br />street be eliminated from the City's Comprehensive Transportation plan. In response to <br />this request the Council directed that City staff prepare some possible alignments of this <br />roadway for their review. Staff has identified two alternatives using a mosaic of aerial <br />county half sections. Because of the format, this map will be presented at the meeting. <br /> <br />Committee Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br /> <br />Public Works Director <br />Principal City Engineer <br />Street Maintenance Supervisor <br /> <br />PW: 03/19/02 <br /> <br /> <br />