My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2002
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2002
>
Agenda - Public Works Committee - 03/19/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:52:27 PM
Creation date
5/12/2003 10:07:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW CASE <br /> <br />RECEIVE DRAFT OF TH 10 CORRIDOR STUDY <br /> By: Brian E. Olson, Principal City Engineer <br /> <br />Background: <br /> <br />In May of 2001 the State of Minnesota initiated the TH 10 Corridor Study with the <br />initiation of the Technical and Policy Advisory Committees. There has been numerous <br />meetings of both committees to discuss the existing and future operation of TH 10 from <br />I35W in Moundsview to TH 24 in Clear Lake. There were five public meetings that were <br />held to discuss alternatives with the public. MnDOT also gave a presentation at the <br />November Public Works Committee meeting to answer any questions regarding the TH <br />10 Corridor and to gather input for the creation of the vision of the corridor. <br /> <br />In February, a complete draft report was issued which contained information on existing <br />conditions including: public involvement in the process, existing land use, roadway <br />geometrics, existing and projected traffic volumes, accident history, current operational <br />service levels, and a review of environmental concerns. It also discusses the need to <br />upgrade the section of TH 10 through Ramsey to a 6 lane freeway with the 3 alternatives <br />that were presented at the November Public Works Committee. <br /> <br />This work has been split into two phases. The first phase is between Round Lake <br />Boulevard and Sunfish Lake Boulevard. This conversion has been anticipated to occur <br />between 2002 - 2010 at a cost of $95 million. The second phase is between Sunfish Lake <br />Boulevard and TH 169 in Elk River and has been anticipated to occur between 2010 - <br />2018 at a cost of $115 million. <br /> <br />As you can see from the attachments, this is a rather large packet of information. Staff did <br />not include the entire study but tried to include the majority the information for your <br />review. MnDOT would like to complete the TH 10 Corridor Study and has asked that <br />comments be received by interested parties by April 3, 2002. <br /> <br />Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Public Works Director <br /> <br />PW: 03/19/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.