Laserfiche WebLink
Staff Recommendation: <br /> <br />The master park and trail plan does not show any proposed parks in this area. The <br />location of the wetlands on the site limits the available areas that could be dedicated as a <br />park. The project site is approximately equidistant from Elmcrest Park and Alpine Park. <br />Construction of the trail along Nowthen Boulevard and proposed segments on the Master <br />Trail plan will increase the connectivity between this projected and the existing parks. <br /> <br />Staffrecommends that park dedication for this project be accepted in cash. The projected <br />amount is $92,400 (42 units x $2,200/unit) with trail dedication of $23,100 (42 units x <br />$550/unit) assuming all of the lots are platted. <br /> <br />Commission Action: <br /> <br />Motion to accept Park and Trail dedications in cash for Shade Tree Cottages. The Park <br />dedication will be $92,400 and trail dedication will be $23, i 00. <br /> <br />Reviewed by: <br />Assistant Director Pnblic Works <br />Parks and Utilities Supervisor <br /> <br />Copies to: <br />Shade Tree Communities, LLC <br />Associate Planner <br /> <br />P&R: 04/14/05 <br /> <br />24 <br /> <br /> <br />