Laserfiche WebLink
Criteria and Measures <br />Points % of Total <br />Points <br />Measure B — Safety issues in project area <br />7. Multimodal Elements and Existing Connections <br />Measure A - Transit, bicycle, or pedestrian project elements and <br />connections <br />8. Risk Assessment 75 <br />Measure A - Risk Assessment Form 75 <br />9. Cost Effectiveness 100 <br />Measure A — Cost effectiveness (total points awarded/total project 100 <br />cost) <br />Total <br />150 <br />50 <br />50 <br />1,100 <br />5% <br />7% <br />9% <br />2IPage <br />