My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:47:04 PM
Creation date
4/24/2020 1:27:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spot Mobility and Safety <br />Definition: An at -grade intersection or corridor -level intersection improvement project that focuses on <br />mobility and safety (described as a Regional Mobility project under Spot Mobility in the TPP). New <br />interchanges or projects that add new thru lane capacity (e.g., two-lane to four -lane expansions) should <br />apply in the Strategic Capacity application category. Projects that address mobility and safety at <br />multiple intersections on a corridor are encouraged. However, projects that propose to reconstruct the <br />roadway for the length of the corridor should apply in the Roadway Reconstruction/Modernization <br />application category. <br />Examples of Spot Mobility and Safety Projects: <br />• New or extended turn lanes at one or more intersections <br />• New intersection controls such as roundabouts or traffic signals <br />• Unsignalized or signalized reduced conflict intersections <br />• Other innovative/alternative intersection designs such as green t-intersections <br />Scoring: <br />Criteria and Measures <br />Points % of <br />Total <br />Points <br />10. Role in the Regional Transportation System and Economy <br />Measure A - Congestion within the Project Area, Level of Adjacent <br />Congestion, Principal Arterial Intersection Conversion Study Priorities, <br />or Congestion Management Safety Plan Opportunity Areas <br />Measure B - Regional Truck Corridor Study Tiers <br />175 <br />100 <br />75 <br />11 Equity and Housing Performance 100 <br />Measure A - Benefits and outreach to disadvantaged populations 50 <br />Measure B - Housing Performance Score / affordable housing 50 <br />connection <br />12. Congestion Reduction/Air Quality 275 25% <br />Measure A - Vehicle delay reduced 200 <br />Measure B - Kg of emissions reduced 75 <br />13. Safety 275 25% <br />Measure A - Crashes reduced 225 <br />Measure B - Pedestrian Crash Reduction (Proactive) 50 <br />14. Multimodal Elements and Existing Connections 100 9% <br />Measure A - Transit, bicycle, or pedestrian project elements & 100 <br />connections <br />15. Risk Assessment 75 <br />Measure A - Risk Assessment Form 75 <br />16. Cost Effectiveness 100 <br />Measure A - Cost effectiveness (total points awarded/total project cost) 100 <br />Total 1,100 <br />16% <br />9% <br />7% <br />9% <br />3IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.