Laserfiche WebLink
Spot Mobility and Safety <br />Definition: An at -grade intersection or corridor -level intersection improvement project that focuses on <br />mobility and safety (described as a Regional Mobility project under Spot Mobility in the TPP). New <br />interchanges or projects that add new thru lane capacity (e.g., two-lane to four -lane expansions) should <br />apply in the Strategic Capacity application category. Projects that address mobility and safety at <br />multiple intersections on a corridor are encouraged. However, projects that propose to reconstruct the <br />roadway for the length of the corridor should apply in the Roadway Reconstruction/Modernization <br />application category. <br />Examples of Spot Mobility and Safety Projects: <br />• New or extended turn lanes at one or more intersections <br />• New intersection controls such as roundabouts or traffic signals <br />• Unsignalized or signalized reduced conflict intersections <br />• Other innovative/alternative intersection designs such as green t-intersections <br />Scoring: <br />Criteria and Measures <br />Points % of <br />Total <br />Points <br />10. Role in the Regional Transportation System and Economy <br />Measure A - Congestion within the Project Area, Level of Adjacent <br />Congestion, Principal Arterial Intersection Conversion Study Priorities, <br />or Congestion Management Safety Plan Opportunity Areas <br />Measure B - Regional Truck Corridor Study Tiers <br />175 <br />100 <br />75 <br />11 Equity and Housing Performance 100 <br />Measure A - Benefits and outreach to disadvantaged populations 50 <br />Measure B - Housing Performance Score / affordable housing 50 <br />connection <br />12. Congestion Reduction/Air Quality 275 25% <br />Measure A - Vehicle delay reduced 200 <br />Measure B - Kg of emissions reduced 75 <br />13. Safety 275 25% <br />Measure A - Crashes reduced 225 <br />Measure B - Pedestrian Crash Reduction (Proactive) 50 <br />14. Multimodal Elements and Existing Connections 100 9% <br />Measure A - Transit, bicycle, or pedestrian project elements & 100 <br />connections <br />15. Risk Assessment 75 <br />Measure A - Risk Assessment Form 75 <br />16. Cost Effectiveness 100 <br />Measure A - Cost effectiveness (total points awarded/total project cost) 100 <br />Total 1,100 <br />16% <br />9% <br />7% <br />9% <br />3IPage <br />