Laserfiche WebLink
The maximum front yard setback from the sidewalk is 20 feet. All of the buildings, with the <br />exception of a couple of buildings that front on Rhinestone Street, meet the setback requirement. <br />The 20 foot setback on Rhinestone is difficult to achieve as the measurement is taken from the <br />sidewalk and according to the master trail plan, .the sidewalk will be in the right-of-way for <br />Rhinestone Street. This extends the measurement distance. Also, the street is designed with <br />slight curves which also add to the distance between units and sidewalk. Resolution is either <br />make adjustments to building locations or obtain a variance. <br /> <br />The City Code requires 20 foot driveways for row house townhomes and 25 foot driveways for <br />back-to-back units. All of the units were designed with 20 foot driveways in anticipation of the <br />pending ordinance amendment. If the City Council does not adopt the ordinance to amend all <br />driveway lengths to 20 feet, the site plan will have to be modified to provide 25 foot driveways <br />on the back-to-back units. <br /> <br />The preliminary plat shows a combination of public and private streets. All of the private streets <br />will be 24 feet wide and meet City standards for length. The development of the plat will include <br />the construction of the following public streets: 146th'Avenue extending west off of Rhinestone <br />Street, East Town Center Drive from Bunker Lake Blvd. south to East Ramsey Parkway, and "Q" <br />Street between Outlot A and Block 2. <br /> <br />The TC-4b District requires 2 off-street parking spaces for each unit; the double garages and <br />driveways provide 4 off-street parking spaces for each unit. The site plan also reflects that an <br />additional 58 overflow parking spaces are proposed. <br /> <br />The Park Commission reviewed the sketch plan on February 10. They stressed the Town Center <br />Development guideline that encourages the use of private courtyards or usable greenspace being <br />provided for the residents of the buildings. The preliminary site plan complies with the <br />development guidelines and provides green spaces for recreational and stormwater management <br />purposes on each block. <br /> <br />The Grading and Drainage and Utility Plans have been reviewed. The necessary revisions are <br />listed in the City Staff Review Letter. <br /> <br />The proposed Landscaping Plan easily exceeds the minimum planting requirements in City Code. <br />The Plan is acceptable with some minor modlfications. No tree preservation plan is required as <br />the site is void of trees. <br /> <br />Movement of pedestrians from this neighborhood to other areas of the Town Center, especially <br />the core, is essential. The perimeter of all 3 blocks will have sidewalks or trails that are either <br />interior to the site or a part of the Town Center trail system in road right-of-ways. The site plan <br />proposes a system of interior sidewalks that connect with the Town Center trail system. Staff has <br />made suggestions for additional connections on each of the 3 blocks. <br /> <br />The Master Development Agreement for Town Center establishes that there are no park or trail <br />fees due on this plat. However, there is a park payment obligation in the Master Development <br />Agreement that requires a cash payment, to the City, upon sale of the property in an amount <br />equal to 750 times the number of eligible units 'on the property in accordande with the zoning <br />regulations. <br /> <br /> <br />