Laserfiche WebLink
d. Are future stages of this development, including development on any outlots~ planned <br /> or likely to happen? If yes, briefly describe future stages, relationship to present <br /> project, timeline and plans for environmental review. <br /> <br /> [] Yes <br /> Local sewers will be constructed as needed to connect to the trunk sewer. The locations of these ~umre local sewer <br /> lines have not been determined yet; the locations will depend on where and when development occurs, <br /> <br />e. Is this project a subsequent'stage of previous project? If yes, briefly describe the past <br /> development, timeline and any past environmental review. <br /> [] No ' <br /> [] Yes <br /> The proposed project is an extension of the trunk sewer system in the City'~ Mississippi sewer district as the <br /> interceptor whs previously extended for the R. amsey Town Center development. <br /> <br />-472- <br /> <br />Total Project Acreage 26.8 acres (,7,790 feet long) ' <br /> The approximate length and total project area of the proposed alternative is <br /> indicated above. The total project areas has been estimated assuming a 150-ft of <br /> permenant and temporary construction easement and includes areas for staging <br /> and stockpiling of materials. <br /> <br />No. of Residential Units: Unattached 0 Attached 0 NA <br /> <br />Commercial, industrial or institutional building area (gross floor space) <br />Indicate areas Of specific uses (in square feet) <br /> <br /> Office N/A Retail N/A <br /> <br /> Light N/A Other industrial N/A <br /> industrial <br /> Institutional N/A Agricultural N/A <br /> <br /> Max units per <br /> building <br />N/A <br /> <br />Warehouse N/A <br />Manufacturing N/A <br /> <br /> Building height (If N/A <br /> over 2 Stories, <br /> compare to heights of <br /> · . nearby buildings) <br />Other commercial (speci fy) N/A <br /> <br />List all known local, state and federal permits, approvals, and financial assistance for the <br />project. Include modificatiOns of any existing permits, governmental review of plans and <br />alt direct and indirect forms of public financial assistance including bond guarantees, Tax <br />Increment Financing and infrastructure. <br /> <br />Unit of Government Type of Application <br /> <br /> Approval of Facility Plan and <br /> Construction Plans and <br /> Specifications (for Minnesota <br /> Public Facilities Authority <br /> funding et. igibility) <br />MPCA Applicatio~ for National To be applied for. <br /> Pollution Discharge <br /> Elimination System (NPDES) <br /> <br />MPCA <br /> <br />Status <br /> To be applied for. <br /> <br /> <br />