Laserfiche WebLink
r.. The projects outlined in this section provide examples of other work completed by TKDA <br /> in the City of Ramsey. <br /> CR 56 (Ramsey Boulevard) Reconstruction - 2004-2006 <br /> The City of Ramsey retained TKDA to provide preliminary design, final design, and <br /> _ construction administration services for the reconstruction of CR 56 (Ramsey Boulevard) <br /> and associated cross street intersections. The project involved the redesign of the <br /> inplace 2-lane roadway to an urban 4-lane divided section with adjacent trails/walks and <br /> intersection channelization. Design Phase tasks included surveying, permitting, and the <br /> — design design of storm sewer, watermain improvements, two traffic signals, and traffic signal <br /> interconnection. Project Management tasks included significant coordination with BNSF <br /> Railway staff for railroad signal, surfacing, and traffic signal preemption improvements <br /> — and coordination with the Minnesota Department of Transportation for construction and <br /> - staging coordination with the adjacent TH 10 improvement project. Joe Weaver was the <br /> TKDA Project Manager. <br /> CSAH 83 (Armstrong Boulevard) Reconstruction -2005-2007 <br /> The City of Ramsey retained TKDA to provide preliminary and final design services <br /> for the reconstruction of CSAH 83 (Armstrong Boulevard) and associated cross <br /> street intersections The project involves the redesign of a rural 2-lane roadway <br /> to an urban 4- lane divided section with adjacent multi-use trails and intersection <br /> channelization. Design Phase tasks included surveying, permitting, and the design OTHER CITY OF <br /> — of storm sewer, watermain and sanitary sewer improvements, three traffic signals RAMSEY EXPERIENCE <br /> and traffic signal interconnection. Project Management tasks included coordinating <br /> geotechnical investigations,wetland delineations, right-of-way platting and will include <br /> implementation of a public involvement plan. The project also involves extensive <br /> coordination with Mn/DOT regarding included improvements to TH 10 and with the <br /> — BNSF Railway regarding crossing improvements. Joe Weaver is the TKDA Project <br /> - Manager. <br /> CSAH 57 (Sunfish Lake Boulevard) Reconstruction - 2007 <br /> In coordination with the City of Ramsey, Anoka County Highway Department retained <br /> ... TKDA to provide preliminary and final design services for the reconstruction of CSAH <br /> - 57 (Sunfish Lake Boulevard) from a rural 2-lane roadway to an urban 4-lane divided <br /> section with adjacent walks/trails and intersection channelization. Design Phase tasks <br /> will include surveying, permitting, and the design of storm sewer, watermain and sanitary <br /> sewer improvements, and the TH 10 traffic signal. Project Management tasks include <br /> - coordinating geotechnical investigations, right-of-way platting and the implementation <br /> of a public involvement plan and coordination with Mn/DOT regarding TH 10 and with <br /> the BNSF Railway regarding crossing improvements. Joe Weaver is the TKDA Project <br /> Manager. <br /> TKDA 7 <br /> ENGINEERS•ARCHITECTS•PLANNERS <br />