My WebLink
|
Help
|
About
|
Sign Out
Home
Bolten & Menk, Inc and Northwest Associated Consultants, Inc.
>
Comprehensive Plan
>
2008 Comp Plan RFP's
>
Bolten & Menk, Inc and Northwest Associated Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 4:22:20 PM
Creation date
10/21/2020 3:30:19 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r\ Tc, a Christopher S. Chromy, P,E,, P,T,O.E, <br /> ConsultivaEngineers&StuveyartTransportation Project Manager <br /> EDUCATION SUMMARY <br /> B.S. Degree Mr. Chromy is a Transportation Project Manager in the Burnsville office <br /> Civil Engineering of Bolton&Menk, Inc. He has over twelve years of transportation <br /> University of Minnesota engineering experience, including transportation system planning, <br /> corridor planning,traffic engineering, and highway design and <br /> construction. <br /> REGISTRATION <br /> Registered Professional EXPERIENCE <br /> Engineer, Minnesotasurface transportation engineering including <br /> g � Mr. Chromy is experienced in p g g <br /> preliminary and final roadway design,traffic signal design, intersection <br /> CERTIFICATIONS control studies, and traffic flow modeling. He has been a project engineer <br /> Professional Traffic for municipal transportation plans, sub-area and corridor studies,traffic <br /> Operations Engineer, forecasting, and systematic development of informed consent. Mr. Chromy <br /> Transportation Professional has been responsible for roadway concept development including project <br /> ,.� scoping, preliminary layout and profile, future traffic flow modeling, and <br /> Certification Board,Inc. <br /> capacity analysis. In addition to his project experience, Mr. Chromy <br /> provides traffic and transportation expertise to Bolton&Menk's municipal <br /> ORGANIZATIONS project managers and clients. <br /> ^ Institute of Transportation <br /> Engineers(ITE) Transportation System Planning: <br /> • Rice County 2025 Transportation Plan <br /> • Geometric Design <br /> Committee • City of Ramsey 2030 Transportation Plan <br /> ,.� • Traffic Engineering • Westside Transportation Planning Study in Big Lake <br /> Council • SE AUAR in Waconia <br /> • Transportation Planning • South Cologne AUAR <br /> ^ Council • City of Belle Plaine Transportation Plan <br /> Corridor Planning: <br /> Minnesota Surveyors and • CSAH 1 Corridor Preservation Study in Rice County <br /> Engineers Society(MSES) • TH 169 Corridor Sub-area Study in Belle Plaine <br /> • 1-35 Freeway Access Planning Study in Rice County <br /> • CSAH 5 Realignment Planning Study in Belle Plaine <br /> • CSAH 12 Realignment Study in Scott County <br /> • TH 71 Access Planning Study in Long Prairie <br /> Design and Construction: <br /> • CSAH 42 Segment 8 Expansion in Dakota& Scott County <br /> • CSAH 12 Reconstruction and Realignment in Prior Lake <br /> • CSAH 5 Realignment in Belle Plaine <br /> ,.� • TH 5 and CSAH 32/CSAH 10 Improvements in Waconia <br /> • TH 169 and CSAH 6 Interchange in Belle Plaine <br /> • CSAH 61 Reconstruction and Realignment in Plymouth &Maple Grove <br /> Traffic Engineering: <br /> • TH 12 Intersection Needs Study in Montrose <br /> • TH 952 and Lothenbach Traffic Signal Revision in West St. Paul <br /> .-. • CSAH 48&Division St Intersection Improvements in Faribault <br /> • TH 10&CSAH 5 Redevelopment Area Traffic Study in Big Lake, MN <br /> .-� • TH 5 and CSAH 30 West Junction Traffic Signal Design in Carver County <br /> • TH 169 Signal Improvements in St. Peter <br /> Page 1 of l <br />
The URL can be used to link to this page
Your browser does not support the video tag.