Anoka County Contract No. C0007856 <br />SIDEWALK: <br />There is one new concrete sidewalk being constructed in the SW quadrant of the intersection along <br />CSAH 116. This new walk is located in the City of Anoka. This new walk will not be the responsibility <br />of the City of Ramsey. <br />The parties agree that replacement of portions of sidewalk may also be needed in the Project. The costs <br />for any concrete sidewalk replacement will be allocated to the County, based on the Anoka County <br />standard cost sharing policy as shown in Exhibit C. <br />The parties understand that the costs for new and replacement sidewalk include concrete surfacing, <br />aggregate base, excavation (including muck excavation), borrow material (granular and topsoil), and turf <br />establishment. The parties agree that the County will pay for the design of the concrete sidewalk. <br />BIKEWAYS: <br />The parties agree that the costs for any new bikeways or bikeway replacement will be based on the <br />Anoka County standard cost sharing policy as shown in Exhibit C. <br />The parties understand that the costs for the bikeway include bituminous surfacing, aggregate base, <br />excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. <br />The parties agree that the County will pay for the design of the bikeways. <br />TRAFFIC CONTROL: <br />The parties understand and agree that portions of CSAH 116 and TH 47 will be open to two-way thru <br />traffic during some phases of construction. During certain phases of construction CSAH 116 or TH47 <br />will be open to one-way traffic, while the opposing traffic will be detoured. Closures will be limited. <br />Access for local and emergency vehicles will be maintained during all phases of construction. <br />The following special event dates will be excluded from the available dates for short-term closures. <br />Anoka County Fair July 20 — 25, 2021 <br />Game Fair August 13-15 and 20-22, 2021 <br />The parties agree and understand the cost share for traffic control for the city shall be a prorated share <br />based on the city project cost divided by the total project cost. <br />DRIVEWAYS: <br />The parties agree that all driveways affected (excluding those identified for removal) by the Project will <br />be reconstructed in kind with 100% project cost allocated to County with same/similar materials to be <br />used in the reconstruction. The cost of any upgrades requested by the City, (e.g., concrete aprons) shall <br />be the sole cost of the requesting City. <br />3 <br />