Laserfiche WebLink
Anoka County Contract No. C0007856 <br />LANDSCAPING/STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, they <br />shall be designed by the City or its selected consultant in accordance with Anoka County Highway <br />Department Landscape/Streetscape Guidelines. The City shall supply the signed plans, specifications, and <br />estimated quantities (using MnDOT Item Numbers) and cost for the proposed landscape/streetscape. The <br />total cost of the design as well as the construction cost above standard median cost will be at the expense <br />of the requesting City. All construction documents must be submitted to the County no later than sixty <br />(60) days prior to the County's advertisement for bids, as scheduled by the County. Future maintenance <br />of any landscaping or streetscaping will be the sole responsibility of the City. <br />RETAINING WALLS: <br />The costs associated with any standard retaining walls required to construct the Project shall be allocated <br />to the County. The parties agree that if the City wishes to include aesthetic treatment to any retaining <br />walls or upgraded materials, any construction costs above standard cost will be at the expense of the <br />requesting City. <br />UTILITIES: <br />The parties agree that the Exhibit A Layout does not include specific proposed utility locations, as those <br />will be determined during later stages of the design process. <br />The City's design of any sanitary sewer and water main utilities are to include signed plans, specifications, <br />and estimated quantities (using MnDOT Item Numbers) and cost. All construction documents must be <br />submitted to the County no later than sixty (60) days prior to the County's advertisement for bids, as <br />scheduled by the County. <br />PERMITS: <br />The parties agree that the County will secure all necessary permits for this Project. The City agrees to <br />coordinate with the County in securing the permits required by the Lower Rum River Watershed <br />Management Organization (LRRWMO), city permits, as well as any other permits that may be required. <br />The County also requests that the City inform the County of any ordinances or city regulations that <br />affect construction at the time of the signing of this JPA (e.g. setbacks, tree clearing ordinances, or any <br />other city ordinances). <br />III. COSTS <br />The parties agree that the standard cost share policies expressed in Exhibit C are hereby incorporated and <br />made part of this JPA. <br />The contract costs of the work associated with the Project, or if the work is not contracted, the cost of all <br />labor, materials, normal engineering costs and equipment rental required to complete the work, shall <br />constitute the "actual construction costs" and shall be so referred to herein. "Estimated construction costs" <br />are good faith projections of the costs, which will be incurred for this project. Actual costs will vary and <br />those will be the costs for which the relevant parties will be responsible. <br />4 <br />