Laserfiche WebLink
i~rt:limimtry Plat and Preliminary Site Plan Review: Symphony At Ramsey Town Center <br />May 12, 2005 <br />?a:2e 5 <br /> <br />l;pdate note 3b to read '6" sidewalk shall be installed at all driveways, 4" may be <br />installed at all other locations' <br />tJpdate note 13 "Sweeping of adjacent streets will be required daily and as requested by <br />city during periods of active construction." Rock construction entrances are not required <br />by the city, sweeping as outlined is the preferred BMP. <br /> <br />l~andlbrm L2.1' <br />;- Veril? adequate clearance at intersections for firetruck, see C2.1 comments. <br /> <br />/\ S WPPP is required for this project. It must reference the SWPPP prepared for the Ramsey <br />Towtx (;enter Project and provide for transfer of responsibility from RTC, LLC to this <br />dcvelt~per and contractor. The stormwater calculation cover sheet indicated the proposed <br />~'uno~'[' fi)r this site exceeds the rate anticipated in the master stormwater plan, and the <br />rcgi~mal calculations should be revised. The regional ponds are in drainage and utility <br />e~sements and cannot be enlarged without re-platting, therefore the difference must be <br />accounted ~br onsite. The master stormwater plan provides rate control for the entire Ramsey <br />Town Center Project. The plan require application of Best Management Practices (BMPs) on <br />each site to enhance stormwater quality. Developments approved to date have provided <br />wat{:r quality treatment for 75%+ of the site. The infiltration basins shown on the plans will <br />provide water quality, treatment, however it appears only 30% of the site drains to these <br />dewct:s, the remainder of the water discharges directly to the regional system. The <br />pet'centage ol: the site draining to a BMP must be increased by rerouting water to the <br />inliltration basins or by installing water quality treatment devices at the points where <br />storm water leaves the site. <br /> <br />Utilities: This subdivision will be served by sanitary sewer and city water services that will <br />be extended into the development. The following sheet specific comments must be <br />addr'essed' <br /> <br />UR:~ 13: <br /> The storm sewer size ibr the line in Q' street is smaller than the upstream pipes and must <br /> be revised. <br /> Profile sheets must be provided for storm sewer. <br /> Coordinate stub locations with Landform .plans. <br /> <br />il.and tb~Tn C4.1' <br /> Note 4: Dip under 8" shall be Class 53. See city specifications. <br /> <br />(~,.mr ~mation re~'crences and sheet overlap must be provided as discussed on previous <br />projects. These plans are the basis for the city as-built records that will be maintained for <br />t'tt[ttre re~:rence on utility connections. <br /> <br />Trec I'reservation. A tree preservation plan is not required as the site is void of trees. <br /> <br /> <br />