Laserfiche WebLink
Preliminary Plat and Preliminary Site Plan Review: Ramsey Town Center 9th Addition <br />May 27, 2005 <br />Revise& dune 24, 2005 <br />Page 7 of 7 <br />24. Mailbox Location: The placement of mailboxes for the townhome units should be located <br /> along the private streets when possible. Location of mailboxes along public streets will need <br /> to be clustered and is subject to the review and approvaI of the Streets Supervisor. <br /> <br />25. Address Signage: The City will be requiring an address location sign (specifying the units <br /> addresses) to be placed at the entrance of all private streets. The required signage will assist <br /> emergency services in locating a specific unit when called to the site. In order to. assist Staff <br /> in review of the placement of signs and to ensure an orderly look of the site, please revise the <br /> signage and striping plan to show address signs. The address signage is subject to the review <br /> and approval of the City Engineer and Police Chief. It should be noted that signs identifying <br /> the development will require a separate sign permit. <br /> <br />26~ REEl Number: The City has enacted a quarterly drainage utility charge. The charge for <br /> townhomes is the same as for single family residences and is cm'rently $6.30/quarter. <br /> <br />The citY Council will be meeting ~t 7:00 p.m. on Tuesday, June 28, 2005 at the Ramsey Fire <br />Station No. 1, 15050 Armstrong Blvd. NW, to review your preliminary plat and site plan. A copy <br />of the case cover sheet is enclosed. If you have any questions or need additional information, <br />please don't hesitate to contact me. <br /> <br />Respectfully, <br /> <br />CITY OF ILiMSE,Y , <br />Associate ~' anner <br /> <br />Leonard Linton, P.E2 k/ <br />Civil Engineer II ()~2~ <br /> <br />CC: <br /> <br />Greg Voss, Ramsey Town Center LLC (via email) <br />Thomas Lincoln, URS (via email) <br />Kevin Miller, URS (via email) <br /> <br />-294- <br /> <br /> <br />