My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:54:15 PM
Creation date
3/9/2021 3:59:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce Westby <br />March 2, 2021 <br />Page 5 <br />EXHIBIT A <br />Zach Schmitz, PE - Civil Engineer Zach will be the designer responsible for water main <br />design and private utility coordination on the project. He has extensive experience addressing <br />these issues on similar municipal projects and working alongside contractors during construction <br />as a resident project representative (RPR). Zach's experience includes civil site design, street <br />design, trail design, storm sewer design, water main distribution systems design, construction administration, <br />and production of plans, specifications, and estimates (PS&E) for municipal reconstruct projects. <br />Ron Farmer, PE Geotechnical Engineer <br />4. 'it <br />Ron will lead the soil borings and geotechnical tasks for the project. He has over 42 years of <br />extensive experience in the geotechnical, geological, and municipal engineering industries. <br />He has lead design efforts teams in plan preparation of plan sets ranging from preliminary <br />to final design. His geotechnical experience involves utility piping, roadway, bridge, directional drilling <br />and retaining wall design for Local, MnDOT, State Aid and Federal projects in Minnesota. He has <br />extensive knowledge of utility design recommendations and procedures through final design. <br />He has been the lead geotechnical engineer on multiple projects involving utility design and <br />corresponding soil corrections. <br />conditions. <br />Chad Jorgenson, PE — Traffic Engineer <br />Chad will lead the traffic control and detour planning for this project. Chad is a senior <br />professional engineer with practical transportation and traffic engineering experience. He will be <br />responsible for preparing traffic control plans and detour routes as necessary for safe working <br />Emily Jennings, PE Water Resources Engir <br />Emily will lead the water resource and storm water pollution prevention design. Emily is a <br />professional engineer with more than 8 years of extensive experience working with municipalities <br />on watershed permitting, MS4 compliance and ensuring design parameters protect our waters. Her <br />experience includes hydrologic studies, grading, drainage, floodplain management, civil site design, <br />erosion/sediment control plan preparation, construction administration, and production of plans, specifications, <br />and estimates (PS&E) for water quality projects. <br />Rebecca Beduhn — Wetlands Lead <br />Rebecca will be responsible for leading the wetland delineation, mitigation and permitting <br />tasks for the project. She is a professional wetland scientist and Minnesota -certified wetland <br />delineator with an extensive background in wetland science, wetland regulatory administration, <br />environmental review and policy and permitting. Rebecca primarily provides wetland services such <br />as delineations, permitting and quality assessments. She has completed delineations on over 150 projects, <br />resulting in more than 750 basins delineated in over six states. <br />PROJECT SCHEDULE <br />The following is a short summary of the project schedule, please refer to the attached project schedule for <br />more detail. <br />Project Kick-off March 2021 <br />Topographic Survey & Data Collection March/April 2021 *Snow melt dependent <br />Utility Meeting #1 April 2021 <br />Approve Preliminary Layout March/April 2021 <br />60% Plan Review May 2021 <br />Utility Meeting #2 June/July 2021 <br />90% Plan Review June/July 2021 <br />Bidding July 2021 <br />Begin Construction August 2021 <br />End Construction November 2021 <br />*The project schedule is greatly dependent on the timing of obtaining existing utility locations in the county right-of-way, geotechnical <br />soil borings and topographic survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.