Laserfiche WebLink
Addition. As the single fhmily units will have a wide variety of styles, it is not possible to review <br />architectural elevations of every unit with the site plan. Each single-family unit will receive Staff <br />review and approval before release of the building permit. It should be noted that the Town <br />Center Development Guidelines establish a brick enhancement threshold of 35% of the non- <br />glazed area of the front facing wall, unless the building design is enhanced through other means <br />such as covered porch areas, broken roof lines, articulated fagade and material or color changes. <br />The minimum/maximum building height in this district is 2-4 stories. Each single family unit <br />wi I1 need to adhere to the Town Center Development Guidelines. <br /> <br />Also on June 28, 2005, the City Council adopted revisions to the Town Center Zoning District <br />that will change the maximum front yard setback to 25 feet and the minimum driveway length to <br />20 feet. The site plan complies with the new standards. <br /> <br />The new lots will be served by a public street loop with a 50-foot right-of-way on the north side <br />of the plat. The development of the plat will include the construction of Zeolite St NW and the <br />other 3 public streets surrounding the plat. The TC-4a District requires 2 off-street parking spaces <br />lbr each unit; the double garages and driveways provide 4 off-street parking spaces for each unit. <br /> <br />'l'he Park Commission reviewed the sketch plan on February 10. They stressed the Town Center <br />l)evelopment guideline that encourages the use of private courtyards or usable greenspace being <br />provided /hr the residents of the buildings. The final site plan complies with the development <br />guidelines and provides green spaces for recreational and stormwater management purposes on <br />each block. <br /> <br />The Grading and Drainage and Utility Plans have been reviewed. Necessary revisions are <br />included in the City Staff Review Letter and the attached Engineering memo. Staff would call <br />attention to a couple items: existing drainage from the Greenwood Hills neighborhood to the <br />north currently drains onto the subject property. Development of the l0th Addition will impact <br />drainage on these lots. <br /> <br />It should be noted that Lots 1-6 of Block 2 are within an area shown as a permanent wetland on <br />the I~RRWMO wetland permit. These lots cannot be platted unless the wetland permit is <br />amended and approved by the LRRWMO. Staff has included a condition in the final plat <br />resolution that a revised final plat be submitted with these lots shown as an outlot until the permit <br />cma be amended. <br /> <br />There arc several easements within the proposed plat that must be vacated prior to recording of <br />thc plat; Staff has included this easement vacation as a condition of plat approval. <br /> <br />Stormv~ater generated by the 8th, 9th, and i0th Additions cannot be fully accommodated on-site; <br />part of thc volume will be directed to the regional stormwater pond in Town Center West Park. <br />Staff has reviewed calculations provided by the applicant} this increase in runoffwill increase the <br />area of the regional pond by 3.0 acre feet, raising the pond level approximately 0.1 feet. <br /> <br /> <br />