Laserfiche WebLink
Trott Brook Crossing EAW August 2021 <br />3. Variolite Street NW and 173rd Avenue NW <br />4. Nowthen Boulevard NW and Ramsey Boulevard NW <br />5. Nowthen Boulevard NW and 167th Avenue NW <br />6. Nowthen Boulevard NW and 173rd Avenue NW <br />7. Nowthen Boulevard NW and 175th Avenue NW <br />Peak hour turning movement counts were conducted at the above intersections on July 28th, 2021 <br />and indicate the AM peak hour occurs at 7:00 AM — 8:00 AM, and the PM peak hour occurs at 4:30 <br />PM to 5 : 30 PM. <br />SSTS analyzed intersection operations using Synchro/Simtraffic, 11th Edition for the 2026 Build out <br />year and for the 2040 Planning Horizon year. There are no improvement projects planned for the <br />study area roadways and none were assumed for the No -Build or Build conditions. <br />Effects on Traffic and Roadways <br />The results of the analysis show that all intersections are expected to operate at acceptable LOS C or <br />better with manageable vehicle queues for both the No -Build and Build conditions. However, the <br />eastbound movement at the intersection of Ramsey Boulevard NW and Nowthen Boulevard NW will <br />experience long delays during the 2040 PM peak time. Preliminary review of Peak Hour signal <br />warrants and roundabout suggest they may be satisfied in the 2040 timeline. Further, preliminary <br />safety analysis indicates this intersection has a higher crash rate than similar intersections in <br />Minnesota. It is suggested this intersection be monitored to determine if safety improvements or <br />traffic control changes should occur by 2040. Details are included in Appendix G. <br />c. Identify measures that will be taken to minimize or mitigate project related transportation effects. <br />As mentioned, the traffic analysis considered full build out by 2026 and evaluated conditions in 2026 <br />and 2040. It is recommended 173rd Avenue NW include a dedicated right turn lane at its intersection <br />with Nowthen Boulevard NW, and that the new intersection at 170th Avenue NW and Variolite <br />Street NW include a northbound right turn lane and a southbound left turn by-pass lane. No other <br />improvement or mitigation are necessary to provide adequate operations at the study area <br />intersections. The site access is already provided with a northbound left turn by-pass lane and <br />southbound right turn lanes from Nowthen Boulevard NW, and similar geometrics (northbound <br />designated right turn lane and southbound left turn by-pass lane) are planned for the new access <br />intersection to Variolite Street NW. The transportation system serving the area will have sufficient <br />capacity to include traffic from the proposed project as well as other anticipated projects. <br />19. Cumulative Potential Effects <br />Preparers can leave this item blank if cumulative potential effects are addressed under the <br />applicable EAW Items. <br />a. Describe the geographic scales and timeframes of the project related environmental effects that <br />could combine with other environmental effects resulting in cumulative potential effects. <br />31 <br />