My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 09/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:08:59 PM
Creation date
10/22/2021 12:12:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
965
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater was encountered in 10 of the 12 soil borings at depths ranging from about 71/2 <br />to 191/2 feet below the ground surface, corresponding to elevations ranging from about 963 to <br />881 1/2 feet above mean sea level. We generally do not anticipate that groundwater will be <br />encountering during grading activities but could be encountered during utility construction <br />and dewatering could be required. <br />With the building pad prepared as recommended, it is our opinion the footings can be <br />designed for a net allowable bearing pressure up to 3,000 pounds per square foot (psf). <br />The following sections provide recommendations for foundation design and construction. <br />4.3 Site Grading Recommendations <br />Excavation Structures exist on the project site that will be removed/ demolished to make way <br />for the proposed development. We recommend that all building remnants including former <br />foundations, footings, floor slabs, foundation walls and underground utilities be removed <br />from within the building, roadway, utility and oversize area. <br />We recommend that all vegetation, topsoil and any soft or otherwise unsuitable soils, if <br />encountered, be removed from below the proposed building and oversize areas. Table 4 <br />below summarizes the anticipated excavation depths at the soil boring locations. Excavation <br />depths may vary and could be deeper. <br />Table 4. Anticipated Excavation Deaths <br />Boring <br />Number <br />Measured <br />Surface <br />Elevation <br />(feet) <br />Anticipated <br />p <br />Excavation <br />Depth (feet)* <br />Anticipated <br />p <br />Excavation <br />Elevation (feet)* <br />Approximate <br />pp <br />Groundwater <br />Elevation (feet)* <br />SB-1 <br />884.3 <br />1 (Pond) <br />8831/2 <br />8661/2 <br />SB-2 <br />903.2 <br />1 (Pond) <br />902 <br />NE <br />SB-3 <br />889.1 <br />1 <br />888 <br />8791/2 <br />SB-4 <br />892.4 <br />1 (Pond) <br />8911/2 <br />881 1/2 <br />SB-5 <br />888.3 <br />1 <br />8871/2 <br />876 <br />SB-6 <br />883.3 <br />1 (Pond) <br />8821/2 <br />876 <br />SB-7 <br />882.6 <br />1 <br />881 1/2 <br />863 <br />SB-8 <br />875.1 <br />1 (Pond) <br />874 <br />863 <br />SB-9 <br />888.5 <br />1 (Pond) <br />8871/2 <br />881 <br />SB-10 <br />890.0 <br />1-12 <br />889 - 878 <br />878 <br />SB-11 <br />902.5 <br />1 <br />901 1/2 <br />NE <br />SB-12 <br />885.7 <br />1 (Pond) <br />8841/2 <br />871.2 <br />* = Excavation and groundwater elevations were rounded to nearest 1/2 foot. NE = Not Encountered <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.